La description
4SEASON
Waterproofing
- Antibacterial ceramic
insulating paint
Occurrence of condensation in a building is serious in winter,
and its cause, is a phenomenon that occurs due to the high
temperature difference
between the inside and outside due to the heating. Hot air contains
more water vapor than cold air, so condensation
will not occur by
itself, but the hot air, that contains excessive condensation of
water vapor in the air, will cause condensation during
the cooling. Four
Seasons can minimize the temperature difference between the warm
and durable yet lightweight vacuum ceramic
beads (such as
ping-pong ball and a hollow microscopic ball of hair in diameter),
and anti-fungal effects are excellent (U.S. FDA, Ministry
of Agriculture, the
U.S. Navy-certified body harmless antibiotics)
products.
Features
â— Excellent antimicrobial, inhibiting fungal formatting for
at least 3 years
â— Eco-friendly harmless water-soluble product
â— Withstand the pressure of *0,**0 psid, superior scratch
resistance
â— Reduce the cost of energy breakthrough
â— Construction costs and defect maintenance costs low
â— Using a different color with mixing color
â— Easy to construct with one-component type
Application
â— Inner and outer walls of buildings
â— Utility room, balcony of apartment, single and apartment
houses
â— Interior wall and ceiling of the underground
building
â— Where all existing insulation is used
Article
◠Application amount : 0.3kg /㎡( 1time construction)
0.5kg / ㎡(1 times construction / poor construction)
â— P.H : 8~9
â— Weight :
0.*5
â— Drying time: about 2
hours
â— The proper temperature
and humidity: *5 ℃ ~ **5 ℃ / *0% below
â— Ingredients: Silane, Siloxane
Construction / coating
operations
â‘ The surface must be clean to prevent foreign
matter.
â‘¡ Install shield and protect materials adjacent to the
constructon site to avoid getting paint
â‘¢ Because the poor paintwork gives significant impact on its
life, should work in compliance with standards by the
specifications before the
Pre-Construction
⊙ foreign body removal: the dust attached to the substrate
surface, the mold is removed fungicide
⊙ Degreasing : oil and fat component is completely wiped
off
⊙ putty work: flux line, large defects such as cracks or
grooves repair with putty
â‘£ Water content of 8% or less of , and fair PH value should
be **9
⑤ After the operation is complete, apply with brush and
roller
⑥ One coat after 4 hours and then dried at *5 ℃, and then
twice to confirm that the coating
⑦ After painting twice to completely dry then should work
oily or water-based paints and wallpapering
⑧ Condensation during construction of the site is a
removable stove, heater or dryer to dry while
working ( at room
temperature is 3 ℃ or higher )
Drying and
maintenance
â— After construction is completed, in order to avoid
physical damage to avoid the contact
â— To be used after shaken enough to re-use the product in
storage
Notes
◠Temperature is less than 3 ℃ to avoid the
construction.
â— If mold remediation work, the operation after *6
hours
â— If adhere to your skin, wash thoroughly with soap and
water
â— Please keep out of reach of children
â— Must be kept at room temperature in winter
Pays: |
South Korea |
N ° de modèle: |
-
|
Prix FOB: |
( Negotiable ) (Negotiable)
Obtenir le dernier prix
|
Localité: |
- |
Prix de commande minimale: |
- |
Commande minimale: |
1000 Kilogram |
Packaging Detail: |
standard export packing |
Heure de livraison: |
20days with contract |
Capacité de Fournir: |
100 Ton per Month |
Payment Type: |
T/T, L/C |
Groupe de produits : |
- |