FOB Price
Obtenir le dernier prix300 ~ 400 / Piece
|Minimum Order
Localité:
HEBEI,CHINA
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
BY BUNDLES AND MARKING ON THE END OF THE DRILL BODY
Delivery Time:
20 days after paid
Supplying Ability:
20000 Piece per Month
Payment Type:
T/T, L/C, Western Union
Personne àcontacter Ms. merry
jinzhou, Shijiazhuang, Hebei
OD OF THE DRILL PIPE(mm) | *0 | *0 | *3 | *9 | **2 | **4 | **7 |
OD OF THE DRILL JOINTS(mm) | *5 | *5 | **5 | **7 | **3.4 | **8.8 | **8 |
THE THICKNESS OF THE DRILL PIPE(mm) | 6.5 | 7.1 | 9.*9 | 9.5/*0 | 8.*8 | 8.*6 | 9.*9 |
THE LENGTH OF THE DRILL PIPE(mm) | ***0~***0 | ***0~***0 | ***0~***0 | ***0~***0 | ***0~***0 | ***0~***0 | ***0~***0 |