FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
China Anping
Prix de commande minimale:
-
Commande minimale:
10 Piece
Packaging Detail:
inner plastic film
Delivery Time:
25 days
Supplying Ability:
1000 Piece per Month
Payment Type:
T/T, L/C, Western Union
Personne àcontacter Mr. Sunny
No.118, South of Zhengrao Road, Anping, Hebei, China, Hengshui, Hebei
Wire Diameter(mm) | Aperture (mm) | Width(m) | Length | |
Inch | MM | |||
2.0mm*3.2mm
|
1"
|
*5.4
|
0.**4m*1.*3m
|
The length does not
limit
|
2.0mm*4.5mm
|
2"
|
*0.8
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
3"
|
*0.2
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
4"
|
**1.6
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
5"
|
**7
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
6"
|
**2.4
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
7"
|
**7.8
|
0.**4m*2.*5m
|
|
2.0mm*6.0mm
|
8"
|
**3.2
|
0.**4m*2.*5m
|
Advantage:
1.Lower the cost of the project.
2.Speed up the construction progress.
3.Ensure the quality of the project.
4.Anti-cracking performance,etc.
5.Good corrosion-resistance and oxidation-resistance