FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
Shandong, China(mainland)
Prix de commande minimale:
-
Commande minimale:
1 Ton
Packaging Detail:
Pallet packing or as customer's request
Delivery Time:
25 days after receiving the order
Supplying Ability:
3000 Ton per Year
Payment Type:
T/T, L/C
Personne àcontacter Ms. ding
zhengtong road, Zibo, Shandong
1.
Casted by melting raw material in the mold, then cooling and
solidifying.
2. Strong glass corrosion resistance and high thermal shock
stability.
3. Good wear-resistance,dregs-resistance and alkali corrosion
resistance.
4. High-purity raw material, barely no pollution.
5. Top quality, long service time.
1.
Sodium silicate furnace, ceramic frit furnace, glass furnace,
etc.
2. Important parts of furnaces where chemical erosion is serious
and temperature changes frequently.
3. Lining of glass furnace.
4. The chemical industrial, metallurgical furnaces.