Sell UOE, LSAW, DSAW, ERW, SSAW, SMLS, SST, DRILLING PIPE, TUBE, CASING, PLANT By JS NEOPLANT CO., LTD, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell UOE, LSAW, DSAW, ERW, SSAW, SMLS, SST, DRILLING PIPE, TUBE, CASING, PLANT

Sell UOE, LSAW, DSAW, ERW, SSAW, SMLS, SST, DRILLING PIPE, TUBE, CASING, PLANT

|

Minimum Order

Localité:

-

Prix de commande minimale:

-

Commande minimale:

1

Packaging Detail:

Negotiable

Delivery Time:

Negotiable

Supplying Ability:

1

Payment Type:

-

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Charles

No61-101 633Nong Wuzhong Road, Shanghai, Shanghai

Contacter maintenant

Description

1.Oil , Gas and Water Transmission Projects and Selling Pipe.
a. UOE PIPE PLANT OD*4INCH*-OD*4INCH
b, LSAW, DSAW PIPE PLANTOD*4INCH*-OD*4INCH
c ERW PLANT OD 1 INCH*-OD*4INCH
d.SSAW PIPE PLANT OD *0 INCH**-OD**6INCH
e.SMLS PIPE PLANT OD 1 INCH*-OD*2 INCH
f.SST PIPE PLANT OD1 INCH****0INCHES
g.DRILLING  PIPE PLANT. OD1 1/2 INCH*-OD 5 2/3 INCH
h.TUBE& CASING PLANT OD *1/**-OD*4 INCH
2. Capacity ; Negotiable ***0TPY**1M TPY.
3. Srandard for API,ASTM,DIN,EC,BS,KS,JIS,GB IPS,GOST.
4. Steel Grade is negotiable.
5. Contract Term and Conditions on SPA,TUEK,EPC,EPC%F, BOT,BOOT,BLT,BET,
6.

Project Executing Procedure on EPC&F,BOT,PPP BOOT,BLT Base in term of collateral as hereunder :

(1) Project Summary or FSR assessment

(2) Letter of Intent

(3) Memorandum of Understanding among parties.

(4) Clean Land Ownership

(5) Project License and all kinds of Approval.

(6) Ministry of Avail Letter or Bank Avail Letter or Proof of Fund.

(7) Appraisal of Collateral or Financial Facility.

(8) Due Diligence Off-Site each project.

(9) Technical Proposal each project,

(*0) Exam of Pre-Qualification for Project Contractor.

(*1) SPV Registration

(*2) Project Contract. & Project Loan Contract.

(*3) Cash Equity or Financial Facility or Legal Collateral.

(*4) Ground Scalping Ceremony & Commence to Build Up.

(*5) Engineering ,Procurement , Construction & Certificate of Completion

(*6) Operating & Transfer,

(*7) Maintenance & Warranty,

(*8) Project Executing Procedure can be cordially negotiated each project in accordance with terms and conditions among parties.

 7. Negotiable Collateral Kinds in accordance with international banking rules,.

a. Sovereign Guarantee.

b. Sovereign Bond.

c. Bank Instruments

d. SKR, Historical Bond, Other kind of Bond,

e. Crude Oil Bond. Crude Oil SWAP Guarantee

f. Mine Concession Ownership.

g. Currency Collateral in USD, EURO, RMB, SPD,HKS,SDR etc.

h. Partial Risk Guarantee. or Buyers Credit.

i. Insurance Bond or Insurance Guarantee

j. Cash EquityUSD, EURO,

k. BOE, Promissory Note, Bank Note

l. Other Kinds of Collateral is Negotiable.
8.
Project Procedure on SPA, TUEK,EPC&F,BLT,BET,BOT, BLT,BET,BOOT and PPP Bases each project as hereunder.

(1) Technical & Engineering Consulting for FSR,EIA,EEAR.

(2) Surveying, Prospecting, Exploring off-site

(3) 3D Conception Design & Drawings.

(4) Procurement& Transportation.

(5) Supervising &Superintendence.

(6) Erection, Installation, Commissioning, Test-Run, Training, Turn-key .

(7) Completion ,Operation & Transfer Ownership

(8) Maintenance & Warranty,

(9) Project Financing or Project Loan Program.

(*0)ProjectManagement and Reimbursement of Loan

(*1) M&A or Share holding Assignment.

 

Send a direct inquiry to this supplier

To:

Mr. Charles < JS NEOPLANT CO., LTD >

Je veux savoir: