Please enter full name.
Please enter product name.
Select Industry.
Email address already exists
Please enter Password.
Enter Conatct number.
Please enter company name.
Please enter date.
Enter Message
By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services
Thank you, your message has been sent.
Invalid Email.
Linhe NO.15,Beijing,Beijing,China China
Personne àcontacter Mr. Shirley Qi
Nom de la société Linhe NO.15, Beijing, Beijing
Main & secondary beams adopt H20 beam; And the panels are made of plywood. Adjustable steel props can be used as shoring system. The assembly and move
120 system consists of a steel frame and plywood. * Due to its Light weight, the formwork can be carried by hand. * This system consists of a
Baili 150 Aluminium Slab Formwork System consists of two parts: Steel props with aluminium prop head, and aluminium frame with plywood panel. 150 Al
Timber Beam Wall Formwork is consisted of H20 Timber Beam, channal steel 10#, pin, connecting unit for outside corner, tie rod, push-pull prop, bracke
This formwork is designed according to the international advanced formwork. This formwork completely makes the formwork implementation, Mechanization
External formwork of 32/24 meters post-tensioning concrete pre-fabricated box girder is divided into sliding mode and rolling mode; the side form of t
We are offering our customers a wide range of Segment Assembly Formwork. The pre-casting and assembly technology has been being improved. The construc
We will contact you soon .
Please select at least one Buyer/Supplier.
Please enter name.
Please select industry.
Enter Password
Please select country.
Please select state.
Please select city.
Please Enter Message.
Enter Verification Code.