Waterproof Hollow Plastic Formwork for Construction By Yaohang Plastic Formwork,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Waterproof Hollow Plastic Formwork for Construction Waterproof Hollow Plastic Formwork for Construction Waterproof Hollow Plastic Formwork for Construction
Next

Waterproof Hollow Plastic Formwork for Construction

35 ~ 40 / Piece ( Negotiable )

|

100 Piece Minimum Order

Pays:

China

N ° de modèle:

YAOHANG

Prix FOB:

35 ~ 40 / Piece ( Negotiable ) Obtenir le dernier prix

Localité:

China

Prix de commande minimale:

35 per Piece

Commande minimale:

100 Piece

Packaging Detail:

Standard wooden and pallet packing

Heure de livraison:

15-20working days

Capacité de Fournir:

10000 Piece per Month

Payment Type:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Ellie Yang

Zhengzhou, Henan

Contacter maintenant

Spécification du produit

  • Color:White,Black
  • Size:915*1830mm 1220*2440mm
  • Thickness:15-20mm
  • Email:Ellie@yhformwork.com
  • Whatsapp:+86 18739153936
  • Wechat:blue1437966541

La description

The Application Of Hollow Plastic Formwork

Plastic Construction Formwork can be used in Construction Engineering, Bridge Tunnel Engineering, Water Conservancy and Hydropower Engineering, Mine Dykes and Underground Engineering, Pipeline Turnover, etc.

1.High-rise Building and Construction Engineering
The building formwork is a kind of temporary structure, which is made according to the design requirements, so that the concrete structure and components are shaped according to the prescribed position and geometrical dimensions, maintain their correct positions, and bear the weight of the building formwork and the loads acting on it. The purpose of carrying out the formwork project is to ensure the quality of concrete works and construction safety, speed up construction progress and reduce project costs.

2.Bridge Tunnel Engineering &Water Conservancy and Hydropower Engineering
Plastic Construction Formwork has light weight, high strength, good hardness, impact resistance, and wear resistance properties, the surface is flat and smooth; the pouring molding effect is good. As it is no water absorption, no deformation, and no mildew, after long-term soaking in water, it is not layered, no foaming, and the sheet size is stable. It is especially suitable for water conservancy projects.

3.Mine Dykes and Underground Engineering, Pipeline Turnover
The toughness of a plastic building template is very good and it can be made into a variety of special templates for curved surfaces. The plastic construction template is resistant to acid, alkali and corrosion; it is very suitable for applications in coastal areas, underground engineering, mines, and seawall dams. No need to do any antiseptic treatment for use and storage, do not pollute the concrete surface.

Installation and Usage Instructions

1. The top plate of the plastic building template is used to lay *5mm thick. The vertical die of the shear wall can be *5mm based on the thickness and height of the wall.
2.the distance between the woods:
â‘ roof plastic formwork support: Woods spacing is determined according to the thickness of floor concrete. In general construction conditions, the woods spacing (center distance) is less than 0.*5m thickness, which is **0mm to **0mm.
â‘¡Supporting shear wall plastic templates: Woods spacing is adjusted by the all wall's height and thickness. For example, the wall height is ***0mm and the wall thickness is **0mm, when the *5mm thickness template is used, the vertical sub rib spacing is **0mm, and the shear wall and pillar width is more than 1 meters, the fixed frame must be added.

3. There is no gap between the shear wall and the column mould, and the part of the Yin angle (the bottom of the wall) must have a wooden side, which is convenient for the connection of the beam, the wall and the formwork. The shear wall formwork must be assembled into a whole after lifting, and then place a flat board , so to reduce labor intensity, and a good forming.

4. The edge of the plastic template is *5 ~ *0mm from the edge of the template. The strength of the nail is moderate and the length of the nail is generally *0 ~ *0mm, so it should not be too long or too short.
5. the wooden side of the floor of the beam must be left out of 1.5 centimeters, and the wall is standing on the mouth of the wooden square, so that it will not leak out the pulp and save the wall material.

Our Hollow Plastic Formwork Advantages

1.Cost Down.
New type of building template can re-use more than *5 times, the average cost is less than US$0.3.
2. Saving energy and Protecting environment.
There's no harmful gas completely in the new type of building template.
3. Smooth surface.
New type concrete template has smooth surface, because of this the demould effect is better than fresh water formwork, no need to plasterer twice.
4. Very well stability.
The new concrete template has excellent property of cold-resistant, hot-resistant, aging-resistant no deformation, low expansion coefficient.
5.High performance in the construction.
New type of building template has high strength, tenacity, no breaking, no layering.

6.Porting and simple operated.
The new concrete template is very light, easy to install. For example it is 6 kg/m2, only 1/2 weight of wooden template, reduce the worker's time and effort effectively.

7. Can transpose at high price.
The template scrapped can also transpose to a new one, only need to pay for the process.

8.Convenient storage.
The new type building template can withstand the corrosion of acid, alkali, and the damage by worms, so the storage has no specific demand for the environment.

9. Simple and convenient demoulding.
No need to brush the release agent, demould easily.

*0. High changeability.
The new concrete template can be incised, cut and drilled arbitrarily.

FAQ

Q1: Are you trading company or manufacturer?
A: We are manufacturer.
Q2: How long is your delivery time?
A: Generally it takes **7 days if we have stock.
Otherwise it takes about **7 days depending on the quantity.
Q3: How soon can I get the quotation?
A: If your information is complete, we offer our quotation within 2 hours.
Q4: Could you supply solutions to us?
A: Sure we can.We have a professional team to solve your questions.
Q5: Do you have a minimum order requirement?
A: Small trial order is acceptable.
Q6. How many workers in the factory?
A: We have more than **0 workers.
Q7. What's the annual capacity?
A: Our capacity is ***0,**0 square meter for a year
Q8. What's the standard of the material quality?
A: Our material can pass 6P,PAHs,EN*1.
Q9. The rubber sheet size design and logo can be customerized?
A: Yes, just send us the design you prefer or you can also choose from our selection.
Q*0. Can I have a sample for quality check?
A: Yes, we can provide 1pc sample for free, AND the express cost will be the buyer stand.
And kindly you are invited to use the TRADE ASSURANCE.
Q*1. What is the production time ?
A: Normally it is **7 days,depending on how many orders before you.
Q*2. What is the payment term?
A: Our payment term are T/T and L/C at sight.
Q*3. How do you gurantee the quality?
A: We have our own inspection team, if the defective rate is above 2%,we will take the responsibility for any quality problems caused by our side.
Q*4. Can you help me ship the goods to our port once ready?
A: Yes,we also have our own shipping agency, we can offer this service at a competitive price.

Contact Us

If you are interested in our products,please contact with *!* *;*@********************hatsapp:**6 **********6
Wechat:blue*********1
Mobile:**6 **********8

Pays: China
N ° de modèle: YAOHANG
Prix FOB: 35 ~ 40 / Piece ( Negotiable ) Obtenir le dernier prix
Localité: China
Prix de commande minimale: 35 per Piece
Commande minimale: 100 Piece
Packaging Detail: Standard wooden and pallet packing
Heure de livraison: 15-20working days
Capacité de Fournir: 10000 Piece per Month
Payment Type: T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Ellie Yang < Yaohang Plastic Formwork >

Je veux savoir: