The Proportion of Motor Control Tunnel Furnace, Tunnel Oven, Gas Oven By Guangzhou Zhengmai Machinery Equipment Co., Ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
The Proportion of Motor Control Tunnel Furnace, Tunnel Oven, Gas Oven The Proportion of Motor Control Tunnel Furnace, Tunnel Oven, Gas Oven
Next

The Proportion of Motor Control Tunnel Furnace, Tunnel Oven, Gas Oven

2825 ~ 5200 USD / Meter

|

9 Meter Minimum Order

Pays:

China

N ° de modèle:

(ZMS-2MB /ZMS- 3MB /ZMS- 4MB)

Prix FOB:

2825 ~ 5200 USD / Meter Obtenir le dernier prix

Localité:

Guangzhou,China

Prix de commande minimale:

2825 per Meter

Commande minimale:

9 Meter

Packaging Detail:

Hard Carton + Woodencase

Heure de livraison:

30 working days

Capacité de Fournir:

1000 Meter per Month

Payment Type:

PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Ms. May

No.6,Changtai Road,Changgang Village,Jianggao Town,Baiyun District,Guangzhou,China., Guangzhou, Guangdong

Contacter maintenant

La description

 

Function:

 

1). Used in Japan for more than *0 years of technology crystallization from the development.

 

2). Safety control system is composed of leading international accessories.

 

3). Furnace the quality increase thickened steel furnace skeleton, to avoid furnace due to the long-term heat deformation.

 

4). The use of the international brand CSR high-density insulation materials, so that the oven temperature to achieve the best results.

 

5). Completely mixed combustion mode to achieve full combustion, and thus save the burning material fee.

 

6). Third Force combustion method to ensure full combustion of the gas

 

7). The length and width can also be customized according to the customer production volume can be customized ultra-wide tunnel furnace.

 

8). Conveyor belt optional chain plate, mesh belt, strip.

 

1) ZMS*2MB

 

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.3KW / M

The average energy consumption: Natural gas: 1.5 m3 / h / m, liquefied petroleum gas (LPG): 0.8 kg / hr / m

 

2) ZMS*3MB

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.*5KW / M

The average energy consumption: Natural gas: 1.8 m3 / h / m, liquefied petroleum gas (LPG): 1 kg / h / m

 

3) ZMS*4MB

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.4KW / M

The average energy consumption: Natural gas: 2.5 m3 / h / m, liquefied petroleum gas (LPG): 1.4 kg / hr / mFunction:

 

1). Used in Japan for more than *0 years of technology crystallization from the development.

 

2). Safety control system is composed of leading international accessories.

 

3). Furnace the quality increase thickened steel furnace skeleton, to avoid furnace due to the long-term heat deformation.

 

4). The use of the international brand CSR high-density insulation materials, so that the oven temperature to achieve the best results.

 

5). Completely mixed combustion mode to achieve full combustion, and thus save the burning material fee.

 

6). Third Force combustion method to ensure full combustion of the gas

 

7). The length and width can also be customized according to the customer production volume can be customized ultra-wide tunnel furnace.

 

8). Conveyor belt optional chain plate, mesh belt, strip.

 

1) ZMS*2MB

 

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.3KW / M

The average energy consumption: Natural gas: 1.5 m3 / h / m, liquefied petroleum gas (LPG): 0.8 kg / hr / m

 

2) ZMS*3MB

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.*5KW / M

The average energy consumption: Natural gas: 1.8 m3 / h / m, liquefied petroleum gas (LPG): 1 kg / h / m

 

3) ZMS*4MB

Dimensions: Width ***0X high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.4KW / M

The average energy consumption: Natural gas: 2.5 m3 / h / m, liquefied petroleum gas (LPG): 1.4 kg / hr / m

 

Function:

 

1). Used in Japan for more than *0 years of technology crystallization from the development.

 

2). Safety control system is composed of leading international accessories.

 

3). Furnace the quality increase thickened steel furnace skeleton, to avoid furnace due to the long-term heat deformation.

 

4). The use of the international brand CSR high-density insulation materials, so that the oven temperature to achieve the best results.

 

5). Completely mixed combustion mode to achieve full combustion, and thus save the burning material fee.

 

6). Third Force combustion method to ensure full combustion of the gas

 

7). The length and width can also be customized according to the customer production volume can be customized ultra-wide tunnel furnace.

 

8). Conveyor belt optional chain plate, mesh belt, strip.

 

1) ZMS*2MB

 

Dimensions: Width ***0* high ***0mm

Furnace size: Width ***0*high **0mm

Voltage: **0V

Power: 0.3KW / M

The average energy consumption: Natural gas: 1.5 m3 / h / m, liquefied petroleum gas (LPG): 0.8 kg / hr / m

 

2) ZMS*3MB

Dimensions: Width ***0* high ***0mm

Furnace size: Width ***0* high **0mm

Voltage: **0V

Power: 0.*5KW / M

The average energy consumption: Natural gas: 1.8 m3 / h / m, liquefied petroleum gas (LPG): 1 kg / h / m

 

3) ZMS*4MB

Dimensions: Width ***0*high ***0mm

Furnace size: Width ***0X high **0mm

Voltage: **0V

Power: 0.4KW / M

The average energy consumption: Natural gas: 2.5 m3 / h / m, liquefied petroleum gas (LPG): 1.4 kg / hr / m

Pays: China
N ° de modèle: (ZMS-2MB /ZMS- 3MB /ZMS- 4MB)
Prix FOB: 2825 ~ 5200 / Meter Obtenir le dernier prix
Localité: Guangzhou,China
Prix de commande minimale: 2825 per Meter
Commande minimale: 9 Meter
Packaging Detail: Hard Carton + Woodencase
Heure de livraison: 30 working days
Capacité de Fournir: 1000 Meter per Month
Payment Type: PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Groupe de produits : -

Send a direct inquiry to this supplier

To:

Ms. May < Guangzhou Zhengmai Machinery Equipment Co., Ltd >

Je veux savoir: