Stainless steel pipe bright solid solution equipment By LUO YANG IWH Co, LTD,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Stainless steel pipe bright solid solution equipment Stainless steel pipe bright solid solution equipment Stainless steel pipe bright solid solution equipment Stainless steel pipe bright solid solution equipment Stainless steel pipe bright solid solution equipment
Next

Stainless steel pipe bright solid solution equipment

( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

LUO YANG IWH

Prix FOB:

( Negotiable ) Obtenir le dernier prix

Localité:

CHINA

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

Fully Packed

Heure de livraison:

Shipping

Capacité de Fournir:

1 Set per Month

Payment Type:

Other

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter CHEN

SAN YUAN ROAD NO.3, Luoyang, Henan

Contacter maintenant

Spécification du produit

  • bright solid solution for stainless steel:negotiable

La description

IWH Stainless steel pipe bright solid solution equipment


In order to produce high quality stainless steel pipe, three elements of solid solution treatment process, heating temperature, holding time and cooling rate, must be strictly controlled.

The on-line bright solid solution equipment of stainless steel pipe produced by our company is to improve the original general production line: the original heating area is about 1 meter, the turn ratio of induction coil, the number of groups are uniformly arranged and distributed, the heating temperature of steel pipe is progressive temperature, the outlet temperature of inductor is rated * high temperature (***0 ≤ ***0), there is basically no temperature time.

It is difficult for the stainless steel pipe after solid solution to enter the cooling section of about 4 meters to achieve the cooling effect. The improved production line: optimize the temperature of the heating zone sensor, so that the temperature of the steel pipe in the whole heating section is basically the same (rated temperature), and the overall temperature of the new heat preservation section is the solid solution design temperature, and the length is generally less than 2 meters. By increasing the temperature zone, the extensibility of stainless steel pipe can be effectively improved and the corrosion resistance of stainless steel can be enhanced. By increasing the cooling zone, the residence time of stainless steel pipe in the heat-sensitive zone of **0 degrees to **0 degrees can be shortened, the inter-granular corrosion can be avoided, and the carbide Austenite grain boundary can be precipitated. Therefore, add 2 meters to the front end of the cooling sleeve. Cooling, using protective gas cooling cycle cooling, to achieve rapid cooling effect. Offline solid solution can be designed as single channel, multichannel and on-line longitudinal displacement multichannel according to the need. This design can bring convenient and fast application to production by changing pipe diameter more frequently.

Pays: China
N ° de modèle: LUO YANG IWH
Prix FOB: ( Negotiable ) Obtenir le dernier prix
Localité: CHINA
Prix de commande minimale: -
Commande minimale: 1 Set
Packaging Detail: Fully Packed
Heure de livraison: Shipping
Capacité de Fournir: 1 Set per Month
Payment Type: Other
Groupe de produits : -

Send a direct inquiry to this supplier

To:

CHEN < LUO YANG IWH Co, LTD >

Je veux savoir: