Roadphalt SBS Modified Asphalt Stabilizer By Shanghai Roadphalt Asphalt Technology Co,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Roadphalt SBS Modified Asphalt Stabilizer
Next

Roadphalt SBS Modified Asphalt Stabilizer

1400 ~ 1600 USD / Ton

|

1 Ton Minimum Order

Pays:

China

N ° de modèle:

-

Prix FOB:

1400 ~ 1600 USD / Ton Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

1400 per Ton

Commande minimale:

1 Ton

Packaging Detail:

25 kgs/bag

Heure de livraison:

15-30 days after payment by sea

Capacité de Fournir:

20 Ton per Day

Payment Type:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Gina

Shanghai, Shanghai

Contacter maintenant

Spécification du produit

  • Brand Name: Roadphalt

La description

I. Product Profiles

 

Roadphalt SBS modified asphalt stabilizer is a kind of high performance asphalt additives which is researched and developed by Shanghai Roadphalt Technology Co., Ltd. The main effect is to improve thermal stability of modified asphalt, and solve the problem of storage segregation.

Product appearance: gray-black powder

Technical Index:
 
 

 

II. Product Features:

 

1. Its used in improving storage stability and softening point of modified asphalt, reducing dosage of SBS and improving comprehensive index of modified asphalt. After adding the  stabilizer, a stable phase interface adsorptive layer is formed between the polymer phase in modified asphalt and based asphalt, which reducing surface tension of phase interface, increasing affinity between two phase, and improving compatibility between two-phase.

 

2. To overcome the shortcoming of low softening point from modified asphalt, the softening point of modified asphalt can be increased by more than *0 degree under usual conditions, and keep the softening point of modified asphalt from reducing.

 

3. It can keep the modified asphalt from segregation during storage and transportation. The modified asphalt storage period can be up to *0 days.

 

4. The product has safety and environmental protection performance, as a non flammable product, it is stable at room temperature, non-toxic, without peculiar smell, high flash point.

 

III. The Dosage and Method

Dosage: 1.**4.0‰ of the total asphalt

Temperature: ******5 degree.

Method: Mix polymer and asphalt by colloid mill for **5 hours, then add the product, and continue mixing for **8 hours. The mixing time should be subject to laboratory formulation, dosage is 1.**2.5‰ of the total asphalt. The product can also be evenly added into matrix asphalt with polymer at the same time, which is milled by colloid mill after adding, then put them into development tank to develop, dosage is 2.**4.0‰ of the total asphalt.

 

IV. Storage and Transportation

 

Storage: It can be stored at room temperature.

Transportation: Convenient to transport, no need special vehicle.

 

 

Pays: China
N ° de modèle: -
Prix FOB: 1400 ~ 1600 / Ton Obtenir le dernier prix
Localité: -
Prix de commande minimale: 1400 per Ton
Commande minimale: 1 Ton
Packaging Detail: 25 kgs/bag
Heure de livraison: 15-30 days after payment by sea
Capacité de Fournir: 20 Ton per Day
Payment Type: T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Groupe de produits : Shanghai RPT Co.,Ltd

Send a direct inquiry to this supplier

To:

Gina < Shanghai Roadphalt Asphalt Technology Co >

Je veux savoir: