Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Colored cold mix asphalt concrete
Next

Colored cold mix asphalt concrete

600 ~ 620 USD / Ton

|

1 Ton Minimum Order

Pays:

China

N ° de modèle:

RPT-AC-5/10/13

Prix FOB:

600 ~ 620 USD / Ton Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

600 per Ton

Commande minimale:

1 Ton

Packaging Detail:

25 per bag

Heure de livraison:

15-30 days after payment by sea

Capacité de Fournir:

500 Ton per Week

Payment Type:

T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Gina

Shanghai, Shanghai

Contacter maintenant

Spécification du produit

  • Brand Name: RPT

La description

Product profile

Roadphalt colored cold mix asphalt concrete surface layer of the system is a efficient construction plan. Which makes the roadphalt colored cold modified asphalt mixture fast molding by using paving equipmentThe system uses unique OGFC*5 open-graded skeleton void structure, the voidage of pavement can reach more than *2%. The thickness of the molding is 0.**1.5cm .

It is used to build road colored asphalt surface or pave Colored asphalt layer on the original pavement.As a new green pavement material, the advantages of system are  economic, environmental, beautiful and convenient . 

Scope                                   

Landscape garden             

      Square 

      Non-motorized vehicle、 Sidewalk

      Bridge floor ã€ Elevated pavement

      Other pavement

 

Product Features
 

  • Economy 
 
  • Reducing the cost of asphalt material greatly

Generally, the thickness of conventional colored hot mix asphalt concrete surface layer not less than 3cm .However , the construction thickness of roadphalt colored cold mix asphalt concrete surface layer of the system just need 0.**1.5cm. Material consumption is reduced by *0%

 

2. Reduce production and construction cost

Before mixing , need to ensure aggregate dry and clean .

 

3. colourful

Cold mix technology without going through the high-temperature test, the pigment the molecular composition of has not changed, so it can maintain colorful and durable.

 

4.Environment-friendly 

Production at room temperature, so there is no asphalt smoke and dust emission.

The whole construction process, without any pollution.



 

5.Convenient construction at room temperature  

 

In the above *0 â„ƒ can be construction. Not existing the loss of cooling the mixture to cool or cold threshing and other issues during construction .

 

Excellent performance stable quality  

 
  • Excellent cohesive property 

The system can ensure the cohesive materials have excellent cohesive properties because of  using special open-graded void skeleton structureIn addition, it cant appear bleeding phenomenon under the vehicle load and high temperature condition

 
  • Good water permeability  

The system uses unique open-graded void skeleton structure , so that can have higher permeability coefficient. Due to the existence of gaps , the rainwater can be ruled out quickly .

 
  • Good slip resistance

The bigger voidage ,the better pavement friction .Due to the system has better slip resistance ,so that can ensure the safety of the driving .

 

4. Low noise and can improve the comfort of driving 

Roadphalt colored cold mix asphalt concrete surface layer of the system use unique OGFC*5 open-graded skeleton void structure, it can reduce the atmospheric pressure. The conventional dense graded pavements noise can be reduced **4 DB  and the cement pavements noise can be reduced **6 DB.

 

Construction guide 

Construction process ï¼š

 

Original pavement  →  pre-treatment  feeding  paving  roller compaction    Molding   open the traffic

 

Steps:

·Pavement pre-treatment

 

The original pavement should be dried and cleanedBesides, the flatness and camber of the road should meet the requirement of construction.

 

·Feeding

Its better to transport by using dump trucks, especially construction in large-scale. The site should have appropriate lifting equipment.

·Paving

We recommend using paver and paving thickness is 0.**1.5cm. If construction in a small area ,you can use artificial pavingIn order to avoid segregation, you should control the thickness and flatness of the pavement.

·Roller compaction

We should finish roller compaction within 0.**1 hours after paving .using double drum roller to static pressure **4 times

·Open the traffic

 The road can be opened after paving is completed *4 hours later . If you need to open the traffic faster , just make sure the asphalt(the surface of the road ) is dry completely .

 

 

Packaging Detail ï¼š

25 kg bag

1,**0 kg/ bag

 

Pays: China
N ° de modèle: RPT-AC-5/10/13
Prix FOB: 600 ~ 620 / Ton Obtenir le dernier prix
Localité: -
Prix de commande minimale: 600 per Ton
Commande minimale: 1 Ton
Packaging Detail: 25 per bag
Heure de livraison: 15-30 days after payment by sea
Capacité de Fournir: 500 Ton per Week
Payment Type: T/T
Groupe de produits : Shanghai RPT Co.,Ltd

Send a direct inquiry to this supplier

To:

Gina < Shanghai Roadphalt Asphalt Technology Co >

Je veux savoir: