Prix FOB
Obtenir le dernier prix1 / Set
|1 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
1 / Set Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
1 per Set
Commande minimale:
1 Set
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
100 Set per Month
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Mr. Saber
416, Jianye RD., Pudong New District, Shanghai, Other
Ore is a volume of rock containing components or minerals in a mode of occurrence that renders it valuable for mining. The ores must be processed to extract the metals of interest from the waste rock and from the ore minerals. The common ores are Bauxite, Iron ore, Manganese, Copper.
Digging ore from the earth is only half the battle. The processing of the ore is often just as challenging and expensive, which takes place in refineries, smelters and mills. Ore processing consists of the following stages:
The purpose of ore crushing and grinding is grinding and size classification to reduce the ore down to a fine particle size
The ore crushing
process:
Generally, the complete
ore crushing plant consists of jaw crusher, ball mill, classifier,
magnetic separator, flotation machines, thickener, dryers and other
major equipment, such as vibrating feeder, bucket elevator and belt
conveyor. This production line feature with high efficiency, low
energy, high capacity, economical and so on.
The primary
crusher reduces ore from the trucks to *-inches or less. That
material goes to the primary stock pile directly that you see
crushed rock falling onto in your image. Two conveyors (out of view
to the right in your image) pull this material directly into each
SAG mill where it is combined with water and mill balls (as
needed).
Big raw ores are feed to the jaw crusher evenly
and gradually by vibrating feeder for primary crushing. After
primary crushing, the material will be transferred to other
crushers by belt conveyor for secondary crushing, then the crushed
materials will be transferred to vibrating screen for separating.
Final, the materials will be transferred into the ball mill evenly
for ore grinding.
The
ore milling process:
Following
grinding in the ball mill, the material is returned via the sump to
the secondary hydrocyclone for resizing. The trash screen removes
wood from the old workings that may have found its way into the
processing circuit. The slurry that remains after this process has
a very fine particle size. Typically, *0% of the ore particles are
less than *0 microns in size (about the same consistency as fine
beach sand). Such a fine particle size is required for gold
liberation C the size required for the cyanide to be able to 'see'
the gold in the leaching process.
The remaining slurry
passes through a pre-leach thickener, to remove some of the water.
The recovered water is reused in the grinding circuit while the
thickened slurry moves into the leaching circuit
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 1 / Set Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 1 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | 100 Set per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | - |