Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
WPE01
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
iron frame
Heure de livraison:
45 days after payment
Capacité de Fournir:
3 Set per Month
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Ms. Alice
North Head of High Speed East Road,Economic Development Zone, Dezhou, Shandong
1.The system includes stone removal, iron removal, bucket elevator, material hopper, crushing and dust removal equipments, etc.
2.The system work under full closed state, reducing the dust and noise pollution greatly,with high work efficiency
3.The material
is with options of plastic, carbon steel or stainless steel,etc,according to goods character and texture. Â
Pays: | China |
N ° de modèle: | WPE01 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | iron frame |
Heure de livraison: | 45 days after payment |
Capacité de Fournir: | 3 Set per Month |
Payment Type: | T/T, L/C |
Groupe de produits : | - |