Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
IP01
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
iron frame
Heure de livraison:
45days after payment
Capacité de Fournir:
5 per Month
Payment Type:
L/C, T/T
Groupe de produits :
-
Personne àcontacter Ms. Alice
North Head of High Speed East Road,Economic Development Zone, Dezhou, Shandong
(1) High-temperature digest,its in line with the high-pressure vessel design,manufacture.
(2) Separating the oil from residue, achieving the target of automated production.
(3) Changing waste into valuable,such as production of bio-diesel,bio-fertilizer,etc.
Â
Â
Pays: | China |
N ° de modèle: | IP01 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Set |
Packaging Detail: | iron frame |
Heure de livraison: | 45days after payment |
Capacité de Fournir: | 5 per Month |
Payment Type: | L/C, T/T |
Groupe de produits : | - |