Prix FOB
Obtenir le dernier prix|
1 Ton Minimum Order
Pays:
China
N ° de modèle:
w-12
Prix FOB:
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Ton
Packaging Detail:
1.Tow-in-one: �20kg/plastic cask âï
Heure de livraison:
1-7days
Capacité de Fournir:
10 Ton per Day
Payment Type:
T/T, L/C
Groupe de produits :
-
Personne àcontacter Nike
Changping, Beijing
Brief introduction:
In recent years the building waterproof coating is a large category
in the rapid development. It is composed of an organic polymer
emulsion and cement and various organic pigments and compounded
with a two-component waterproof coating. It is a new building
material with both organic materials with high flexibility and
inorganic materials with good durability .High strength and tough
waterproof layer formed after the film.
Main features:
1.Take water as the dispersion medium,non-  toxic,harmless to the environment.Its a kind of environmental friendly product.
2.Paint films have compare the high elasticity and the tensile strength,waterÂ
   resistant,the weathering resistance is good.
3.Can be directly used in many kinds of basic plane,no matter in the moist base or dry.
4.Easy to operate. There is no limits for basic unit moisture. Construction time could be reduced.
5.Any color auxiliary can be added to this product to achieve the effect of waterproofing and decoration.nce is good.
Packing:
1.Tow-in-one:
â‘ *0kg/plastic cask
â‘¡*0kg/plastic cask
2.Single component:
â‘ *0kg/plastic cask
â‘¡*0kg/plastic cask
3.Double component:
*0kg(liquid)/cask**0kg/Sack(powder)
Where to
use:
In new and cold construction,basement,roof,toilet,ect.And the waterproof,corrosion prevention in metal pipeline. moist or dry bricks and stones, the mortar,the concretes,the metal,the lumber,each kind of hear insulating layer base.any waterproofing and repairs constructions.
How to use:
1.Clean the surface, surface requires a firm and flat, with
strength, not hollowing loose, sand and other phenomena, the
yin-yang angle should be put into a circular, with a water outlet
phenomenon should do first leakage treatment.
2.Use the blender stir and slowly add the powder, stirring for 5
minutes, stirring until the feed does not contain aggregate, with
good material should be used up within 2 hours, otherwise will
influence the construction of elevated viscosity. (Powder material
can be directly used to replace ordinary Portland
cement)
Coating weight ratio method according to the product packaging
dimension scale ingredients, water adding amount can be adjusted
properly, to adjust the coating station consistency, to meet the
different parts of the construction elevation and
plane.
Embedded in the groove sealing material, in the corner, pipe root
and other details shall many times (**5 times of brushing),
underground engineering to paving a layer of reinforcement
material
 Each layer of brushing time interval of 8 hours, the winter
should be extended, each over the film in0.**0.5mm as well, should
not be over too thick, inside construction should not add water or
less water as well, in order to avoid coating
flows.
 3.Apply construction, primary processing, primer, additional
layer construction, surface coating and protection
layer
 4.Using a brush or roller brush paint brush evenly on the
grass-roots , should be painted horizontal and vertical cross,
interval of 4 hours or more. General primer two, surface coating
two, additional layer using ****0grams / square meters of non-woven
fabrics, each square was 3kg, thickness of 1.5mm, if have special
structural requirements may account for the increased surface
besmear brushes number.
Matters needing attention
1.Ingredients to accurate metering, mixing evenly, use should not
add water.
2.Construction of the temperature should be above 0 degree, under
negative temperature construction shall take the necessary freezing
measures
3,Waterproof coating is now with the current use, and used it
within four hours.
Pays: | China |
N ° de modèle: | w-12 |
Prix FOB: | Obtenir le dernier prix |
Localité: | China |
Prix de commande minimale: | - |
Commande minimale: | 1 Ton |
Packaging Detail: | 1.Tow-in-one: �20kg/plastic cask âï |
Heure de livraison: | 1-7days |
Capacité de Fournir: | 10 Ton per Day |
Payment Type: | T/T, L/C |
Groupe de produits : | - |