Prix FOB
Obtenir le dernier prix750 ~ 800 USD / Ton ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
HJ-SP
Prix FOB:
750 ~ 800 USD / Ton ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
750 per Ton
Commande minimale:
1 Set
Packaging Detail:
BULK PACKING THEN PALLET PACKED
Heure de livraison:
30DAYS AFTER PAYMENT
Capacité de Fournir:
200 Ton per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, PayPal
Groupe de produits :
-
Personne àcontacter Ms. zhu
wuyun road, Wuxi, Jiangsu
steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements
Â
1) A
larger capacityÂ
When
the scaffolding geometry and structure is compliant with the
relevant requirements, the general single-tube column scaffold
bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design
value).
Â
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
Â
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
Â
PRODUCT TYPES
Pays: | China |
N ° de modèle: | HJ-SP |
Prix FOB: | 750 ~ 800 / Ton ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 750 per Ton |
Commande minimale: | 1 Set |
Packaging Detail: | BULK PACKING THEN PALLET PACKED |
Heure de livraison: | 30DAYS AFTER PAYMENT |
Capacité de Fournir: | 200 Ton per Month |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, PayPal |
Groupe de produits : | - |