Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House By GOU YE BAO FORMWORK CONSTRUCTION CO., LTD.,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House
Next

Safe High-Efficiency Construction Tools Modular Self-Climbing Scaffolding Mobile Steel House

760 ~ 3000 / Set ( Negotiable )

|

1 Set Minimum Order

Pays:

China

N ° de modèle:

GYBJ 16-Dly7

Prix FOB:

760 ~ 3000 / Set ( Negotiable ) Obtenir le dernier prix

Localité:

Foshan, china

Prix de commande minimale:

760 per Set

Commande minimale:

1 Set

Packaging Detail:

Bundle, Package Box, Pallet, Container

Heure de livraison:

Generally 5-30 days, according quantity

Capacité de Fournir:

600 Set per Year

Payment Type:

L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Joyce

Gong Ye Da Dao, Foshan, Guangdong

Contacter maintenant

Spécification du produit

  • Material: :steel
  • Type: : Mobile
  • Specifications: :customized
  • Structural Style: :Integrated
  • Color: :customized
  • Usage ::Building protection
  • Model NO.::GYBJ 16-Dly7
  • Framework: :Combined Scaffolding
  • Supporting Mode: :Suspended Scaffolding
  • Useful life::10~13 years (Reasonable maintenance)
  • Certificates::IOS, SGS

La description

Our Products

Product Description
     Self-climbing Scaffolding System is an Safe and efficient building protection equipment emerging recently, especially, for high-rise building construction.

     Its built-in safety screen design enclosing five floors once can effectively prevent workers and objects falling when operating forming a safety working area, as well as, reducing the impact of bad weathers.Modular design and reusable features offer convenient disassembly saving time, labour and materials. Automatic climbing device and anti - fall device greatly improve the efficiency by increasing the security of staff.

    Intelligent full steel wall attached auto-lifting scaffold specially custom for different construction projects facade safety protection.
 
Product Details
Product Name: Intelligent full steel modular attached type lifting scaffold   Linear(Horizontal)span: ≤7m
Scaffolding Part Type: Scaffolding Frames Broken line or curve span: ≤5.4m
Move Method: Attached Lifting Scaffolding Horizontal Cantilever plate length: ≤2m and no more than 1/2 span 
Construction Properties: Building Scaffold Frame full height *support span: ≤**0
Application: High-rise/High Altitude building construction/Formworking supporting Lifting Speed: *2cm/Min
Certification: ISO***1,SGS Anti-falling breaking distance: ≤ *0mm
Structural Style: Integrated Synchronization error of adjacent positions: ≤ *0mm
Colour: Different colour available  Working load: ≤ 2.0KN/, 3 floors & ≤ 3.0KN/, 2 floors
Surface Treatment: Painted Lifting load: ≤ 0.5KN/, 2 floors
Supporting Mode: Wall climbing/ Hanging/ Attaching Scaffolding Rate power of hoist: **0W
Specification: customized Rate load of hoist: 7.5T
Distance from wall: *0cm Screen windshield coefficient: 0.*2
Climbing Scaffolding Unit Height:  ≤*5m(no more than 5 floors)    
Climbing Scaffolding Unit Width: 0.7m


Our Company & Factory
Company Brief
      Foshan Gouyebao Formwork Construction Co., Ltd. is located in No.**6, Gongye Dadao, Jingbu Village, Genghe Town, Gaoming District, Foshan city, Guangdong Province. The company has a professional management team of more than **0 staffs, focusing on the construction of the climbing frame, climbing formwork design, manufacturing and professional contracting.

     We have specialized production equipment, such as the guide rail H welding, CNC series cutting machine, guide rail correction machine, sandblasting machine, and other latest professional machine. Our annual production capacity is more than ****0 Tons.

     Our products including self-climbing scaffolding, climbing formwork, H frame scaffolding, steel scaffolding modular, intelligent scaffolding accessories, steel structure frame, hydraulic climbing system, suspended platforms and the professional customized service of construction project.


FAQ
1. Q: Are you trading company or manufacturer?
    A: We are factory

2. Q: How long is your delivery time?
    A: The delivery time is within ***5 days after received the deposit, please contact us for more details

3. Q: What is your terms of payment?
    A: *0% T/T in advance + *0% balance before shipment or LC at sight

4. Q: Is your product only sold as a whole?
    A: No, we also sell it in parts

5. Q: What is your main market?
    A.:Our main markets are Domestic Market,Middle East, Southeast Asia, Africa, European etc.

6. Q: What is your MOQ?
    A: 1 Set per time if out of stock. There is nothing requirement for our stock available.

7. Q. Can you provide special customized solution for us?
    A. Sure, customize service is available, that is one of our business. Please let us know your idea

8. Q: Can we visit your factory?
    A: Sure,feel free to contact us before your visit.The address is No.**6, Gongye Ave, Tingbu Village, Genghe Town, Gaoming District, Foshan city, Guangdong, China

If you have any another questions, please feel free to contact us!

Pays: China
N ° de modèle: GYBJ 16-Dly7
Prix FOB: 760 ~ 3000 / Set ( Negotiable ) Obtenir le dernier prix
Localité: Foshan, china
Prix de commande minimale: 760 per Set
Commande minimale: 1 Set
Packaging Detail: Bundle, Package Box, Pallet, Container
Heure de livraison: Generally 5-30 days, according quantity
Capacité de Fournir: 600 Set per Year
Payment Type: L/C, T/T
Groupe de produits : Project Case

Send a direct inquiry to this supplier

To:

Ms. Joyce < GOU YE BAO FORMWORK CONSTRUCTION CO., LTD. >

Je veux savoir: