Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details
Next

Hollow core plate, widely used in bridge construction, public transportation construction, support mass customization, refuse cash on delivery, contact customer service for details

9999 ~ 9999 / Unit

|

9999 Unit Minimum Order

Pays:

Others1

N ° de modèle:

Hollow cast slab

Prix FOB:

9999 ~ 9999 / Unit Obtenir le dernier prix

Localité:

Taishan Village, Zhangwan Street, Caidian District, Hubei Province

Prix de commande minimale:

9999 per Unit

Commande minimale:

9999 Unit

Packaging Detail:

-

Heure de livraison:

15 to 20 days

Capacité de Fournir:

99999 Unit per Year

Payment Type:

PayPal, Other

Groupe de produits :

-

Contacter maintenant
Membre gratuit

Personne à contacter Huang Yuebin

Chengdu, Sichuan

Contacter maintenant

Spécification du produit

  • color:blue

La description

â‘´ Before the formwork is dropped, the gangue and sundries between the steel formwork and the shaft wall shall be removed to prevent the formwork from jamming.
(2) When the screw rod fails to shrink or the formwork is stuck, it is forbidden to drag and rub the formwork or hit the formwork with bucket and grab.
(3) In order to ensure that the formwork falls synchronously, marks can be made on the wire rope at the wellhead before the formwork falls, which can be adjusted at any time according to the marks and stress conditions.
(4) When aligning, pay attention to stabilizing the center line. If there is a slight swing, take the middle value. While leveling and aligning, ensure that the joints are flat.
(5) During formwork falling, the gangue on the formwork shall be removed first. No one is allowed to stand above and below the steel formwork, and other personnel are not allowed to carry out irrelevant work.
(6) When pouring concrete, first pour the four fixed formworks under fire, and then increase them evenly around in order. Special personnel shall be assigned to tamp them carefully to avoid honeycombs, pitted surfaces and dog holes.
(7) The place where the suspended steel wire rope is five meters away from the persecuted formwork shall be wrapped with rubber hose to prevent the explosion. Each piece shall be inspected before moving, and any damage beyond the limit shall be handled as required.

Pays: Others1
N ° de modèle: Hollow cast slab
Prix FOB: 9999 ~ 9999 / Unit Obtenir le dernier prix
Localité: Taishan Village, Zhangwan Street, Caidian District, Hubei Province
Prix de commande minimale: 9999 per Unit
Commande minimale: 9999 Unit
Packaging Detail: -
Heure de livraison: 15 to 20 days
Capacité de Fournir: 99999 Unit per Year
Payment Type: PayPal, Other
Groupe de produits : -

Mots-clés correspondants Wuhan Hanjiang Metal Steel Mould Co., Ltd

Send a direct inquiry to this supplier

To:

Huang Yuebin < Wuhan Hanjiang Metal Steel Mould Co., Ltd >

Je veux savoir: