Prix FOB
Obtenir le dernier prix9999 ~ 9999 USD / Unit
|9999 Unit Minimum Order
Pays:
Others1
N ° de modèle:
Corner template
Prix FOB:
9999 ~ 9999 USD / Unit Obtenir le dernier prix
Localité:
Taishan Village, Zhangwan Street, Caidian District, Hubei Province
Prix de commande minimale:
9999 per Unit
Commande minimale:
9999 Unit
Packaging Detail:
-
Heure de livraison:
15 to 20 days
Capacité de Fournir:
99999 Unit per Year
Payment Type:
PayPal, Other
Groupe de produits :
-
Personne à contacter Huang Yuebin
Chengdu, Sichuan
1. Light weight and large plate width, the weight of combined steel
formwork can be reduced by 1/4~1/5, and the plate width of formwork
can be increased, reducing the joints of formwork assembly.
2. The amount of steel used can be reduced by 1/2 compared with the
combined steel formwork.
3. The formwork has small adsorption force and is easy to
demould.
4. There are many times of turnover, and *0 times of turnover can
be used.
5. Good thermal insulation performance is conducive to the thermal
insulation of concrete in winter.
6. It is convenient for maintenance. Some damaged surfaces can be
repaired on site. When a wall is worn, it can be turned over for
application.
7. It is easy to disassemble and assemble, with small deformation
and high utilization rate.
8. The reinforcement system has high component strength, large
combined stiffness and high plate accuracy.
9. The abutted joint is tight, not easy to deform, and the formwork
has good integrity and strong seismic resistance.
*0. The poured surface is relatively perfect and safe.
Pays: | Others1 |
N ° de modèle: | Corner template |
Prix FOB: | 9999 ~ 9999 / Unit Obtenir le dernier prix |
Localité: | Taishan Village, Zhangwan Street, Caidian District, Hubei Province |
Prix de commande minimale: | 9999 per Unit |
Commande minimale: | 9999 Unit |
Packaging Detail: | - |
Heure de livraison: | 15 to 20 days |
Capacité de Fournir: | 99999 Unit per Year |
Payment Type: | PayPal, Other |
Groupe de produits : | - |