Prix FOB
Obtenir le dernier prix1 ~ 1e+07 USD / Set ( Negotiable )
|1 Set Minimum Order
Pays:
China
N ° de modèle:
non-standard
Prix FOB:
1 ~ 1e+07 USD / Set ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
1 per Set
Commande minimale:
1 Set
Packaging Detail:
regular packaging
Heure de livraison:
60-90 working days after receipt deposit
Capacité de Fournir:
20 Set per Year
Payment Type:
Western Union, L/C, T/T
Groupe de produits :
Personne àcontacter Tony
Jiaoshe village No.1113, Dongguan, Guangdong
Â
 Â
 Chuang Zhi Coating Equipment Engineering Co., Ltd is one
of the leading companies specializing in surface treatment,
Planer-Type Hard Anodizing Production Line is one of our
advantaged products which we have particular technology and
experience almost *0 years ,the Oxidation Line use the principe
of Anode Oxidation to produce a layer of oxidation film on
surface of aluminum parts , which have the advantage ofÂ
hardness , corrosion resistance,adhesion and
insulation.
Â
 Product Overviews
      The equipment included in Hard Anodizing  Production Line: (Only for reference)
Â
1. Sandblasting machine (optional )Â :Â
    Variety type be selectable,such as automatic,manual,or the capacity customized according to client's requirement.
Â
2.  Tank :
    Including dregreasing tank , hot rinse  tank , picking tank , cascade rinse tank , cascade collar rinse tank ,acid deoxidation tank , Electrolytic Brightner Tank  , Alkaline Deoxidation Tank , Anodizing Tank  , Electrolytic Colouring Tank , Cold Seal Tank neutralizing tank,pure water washing tank, etc. The material of tank determined by the solution inside tank, such as PP ,SUS#**4,SUS#**6,the hard anodizing tanks have be add a layer of heat insulation to keep the sulphuric acid cold.sealing tank is used for sealing treatment to oxidation film.
Â
3.Gantry crane :
    Be used for turning workpiece among the tanks
4.Supporting Equipement :
    Like rectifier , chiller , circulation pump,waster water and gas treatment,flight bar , fixture etc       Â
   1.What is the quotation process of our company ?
we need to konw your requirement as follow (point 2) as many as possible  ,then we will arrange budget
Â
  2.What  do we want to know based on your requirements?
We hope to get the first information you provide as
follow:
1) The name of
workpiece Â
2) The size of standard workpiece Â
3) The max.Size and weight of
workpiece
4) The capacity
(output) of Hard
Anodizing Line you
desire  Â
5) The heating
resource ?(electricity,diesel,LPG
?)
6) What is the voltage you
provide?
7) Have any special requirement of  process
flow ?
8) It is better to provide the workshop
building layout drawing, according to it ,we
can arrang the layout of  Hard
Anodizing Line .
 3
.How much time do the factory manufacture the Hard
Anodizing Production Line?
It takes almost **3 months to finish the  Hard
Anodizing Production Line after we
both agree on scheme and sign the contract..
 4.How to use
it?
We'll provide onsite
installation and training
service till your workers can fully
operate it for production purpose.
Pays: | China |
N ° de modèle: | non-standard |
Prix FOB: | 1 ~ 1e+07 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 1 per Set |
Commande minimale: | 1 Set |
Packaging Detail: | regular packaging |
Heure de livraison: | 60-90 working days after receipt deposit |
Capacité de Fournir: | 20 Set per Year |
Payment Type: | Western Union, L/C, T/T |
Groupe de produits : | Anodizing Production Line |