Prix FOB
Obtenir le dernier prix1 /
|- Minimum Order
Pays:
China
N ° de modèle:
Non-standard
Prix FOB:
Localité:
-
Prix de commande minimale:
1
Commande minimale:
-
Packaging Detail:
According to the client's requirement or feature of equipment , using multi-packing method to pa
Heure de livraison:
3 Months
Capacité de Fournir:
12 Set per Year
Payment Type:
L/C, T/T
Groupe de produits :
Personne àcontacter Tony
Jiaoshe village No.1113, Dongguan, Guangdong
Packaging Details: | According to the client's requirement or feature of equipment ,using multi-packing method to pack the equipment, such as wrap devices with stretch film to protect the coating of surface ,or pack the small parts with cardboard boxes ,heavy parts with wooden case |
---|---|
Delivery Detail: | 3 Months |
The Ceramic Paint Spraying Production Line have been used in many industry, and the Ceramic Coatinghave many excellent advantages. The main application and the advantages used in cookware industry :
Because the metal cannot be used directly for cookware ,the attached coating is very important, the Ceramic Coating get more and more praise for its excellent nature and healthy environmental protection. Especially its stickness is more stronger than Teflon when manufacturing nonstick pan, and not easy to peel off, it isnon-toxic and harmless ,and not easy to decompose for a long time in the high temperature environment.
The product with Ceramic Paintas follow:
Â
Â
Â
Product Description
The whole Ceramic Paint Spraying Production Linecan be customized according to clients requirement ,such as the size range of your work piece, production capacity you want , technological process you required ,and the layout design to meet your work shop.
Main equipments included in Ceramic Paint Spraying Production Line as follows( can be selectable and adjustable):
Â
Equipment Name |
Function and Description |
Desktop Pretreatment With Drying Oven  |
Automatic degreasing ,water- washing ,air blowing ,drying and cooling ,it's usually used for dedusting and derusting before sandblasting. The process of acid washing ,alkali washing ,neutralizing and water washingcan be designed according to clients requirement or the feature of work piece. |
SandblastingMachine |
We have a variety of type for client to choose, automation, semi-automation ,manual type and the production output can be customized according to client's requirement. The machine equip with dust collecting device , and sand recycle device. |
Automatic Dedusting Room |
Using for dedusting before the process of spraying primer |
Preheating Oven |
Adopt the form of far
infrared radiation heating to preheat the work
piece before spraying primer, the temperature is usual about
*0℃**0
℃ |
Double-layer water-curtain room ( Spray Room) |
Used for coating spraying, adopt imported famous brand spray guns, water- curtain is used for absorbing and cleaning the atomized paint to avoid polluting the environment and harming the health of workman. |
Drying oven and high temperature curing furnace |
The drying oven is used for drying primer coating , and the high temperature curing furnace is used forcuring the mid-coating and top-coating . |
Supporting system |
Central Control System , exhaust piping and drain piping system , waste water treatment system and environmentally friendly waste gas treatment system. |
Â
Â
The below Production Flow is only for reference , the specific need according to actual requirements!
1.Pre-treatment
before sandblasting
Loading > Degreasing > Wash > Acid Wash / Alkali Wash >
Neutralizing > Wash >
Blow water > Drying >
Cooling
> Unloading ( for sandblasting)
2.Sandblasting
Loading > Sandblasting > Unloading the work piece to coating
conveyer belt
3.
Inner Coating Process
Loading> Auto dust removal > Preheat> Primer Spray > Spray Top-coat > Transfer Workpiece >
Low Temperatur Volatilize> High Temperature Sintering > Sharp freezing > Unloading
4. Outer Coating Process (Optional)
Loading > Spray outer coat > Turn to high temperature furnace > high temperature sintering > Sharp freezing
> Unloading
1. Design: We have a professional Engineering Design Team to design scheme to meet your requirements , such as therang of workpiece size, capacity of production , and other especial requirement
2.
Manufacturing:
We have an excellent manufacture team
to produce the products of superior quality , which be made using best
material.
3.Installation and Debugging:
We can sent engineer on site
to charge of Installation and
debugging
4.After-service Promise:
We promise to provide 1 year warranty
of maintenance
1. What is the quotation process of our company
We need to know your requirement as follow (point 2),then we will arrange budget.
2.Which the requirement or parameter we should know?
We hope to get the first information you provide as follow:
1) Thenameof work piece
2) The sizeof standard work piece
3) Themax.
sizeand weight of work
piece
4) The materialof work piece
5) Thecapacity
(output) of coating line you
require
6) Theheating resource
(electricity ,diesel, LPG ,nature
gas?)
7) What is the voltageand
frequency you
provide?
8) Have any special requirement of process
flow .
9)
Whichkind of
paint do you use? Does it have any
special drying temperature
and time requirement?
*0) It
is better to provide theworkshop building layout drawing,
we can arrange the layout of coating line
accordingly.
*1)The direction oflogistics flow
*2) The direction of drainage and exhaust and treatment location of waste water and gas.
3.
How much time to finish the Ceramic Paint Spraying Production
Line?
It takes almost **3 months to finish the Ceramic Paint Spraying Production Line after we both agree on scheme and sign the contract.
4. How
to use it?
We'll provide onsite
installation and training service till your
workers can fully operate it for production
purpose.
Â
Â
Â
Pays: | China |
N ° de modèle: | Non-standard |
Prix FOB: | 1 / Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 1 |
Commande minimale: | - |
Packaging Detail: | According to the client's requirement or feature of equipment , using multi-packing method to pa |
Heure de livraison: | 3 Months |
Capacité de Fournir: | 12 Set per Year |
Payment Type: | L/C, T/T |
Groupe de produits : | Non-stick Coating Production Line |