Galvanized steel scaffolding plank/metal board By Scaffolding and Steel pipe Co., Ltd,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Galvanized steel scaffolding plank/metal board
Next

Galvanized steel scaffolding plank/metal board

10 ~ 20 USD / ( Negotiable )

|

25 Metric Ton Minimum Order

Pays:

China

N ° de modèle:

Steel Plank

Prix FOB:

10 ~ 20 USD / ( Negotiable ) Obtenir le dernier prix

Localité:

-

Prix de commande minimale:

10

Commande minimale:

25 Metric Ton

Packaging Detail:

Standard export package

Heure de livraison:

Within 20 days

Capacité de Fournir:

100000 Metric Ton per Year

Payment Type:

Western Union, D/P, L/C, T/T

Groupe de produits :

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Yamin

No.46 Renmin East Road, Changsha, Hunan

Contacter maintenant

Spécification du produit

  • Material:Q195
  • Surface:Pregalvanized
  • Size:210/240/250mm

La description

Galvanized steel scaffolding plank/metal board​ 

PRODUCT NAME:METAL PLANK

 1)   A larger capacity  

       When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).

2)   Easy disassembly, erection and flexible  

      Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

3) To compare the economy

     Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving  working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.

Size (mm)

Weight (kg/pc)

Size (mm)

Weight (kg/pc)

WALK BOARDS

CATWALK

**0 x *5 x 1.2 x ***0

*3.*0

**0 x *0 x 1.2 x ***9

*5.*0

**0 x *5 x 1.2 x ***0

*0.*6

**0 x *5 x 1.2 x ***9

*3.*0

**0 x *5 x 1.2 x ***0

6.*3

**0 x *5 x 1.2 x ***9

*3.*0

**0 x *5 x 1.2 x ***0

3.*9

**0 x *8 x 1.2 x ***9

*2.*0

**0 x *5 x 1.2 x ***0

*4.*7

**0 x *5 x 1.2 x ***9

*2.*0

**0 x *5 x 1.2 x ***0

*1.*3

**0 x *0 x 1.2 x ***9

*1.*0

**0 x *5 x 1.2 x ***0

7.*9

**0 x *5 x 1.2 x ***9

*0.*0

**0 x *5 x 1.2 x ***0

3.*4

**0 x *5 x 1.2 x ***9

9.*0

**0 x *0 x 1.2 x ***0

*5.*7

**0 x *8 x 1.2 x ***9

9.*0

**0 x *0 x 1.2 x ***0

*1.*4

**0 x *5 x 1.2 x ***9

9.*0

**0 x *0 x 1.2 x ***0

8.*0

**0 x *0 x 1.2 x ***9

*1.*0

**0 x *0 x 1.2 x ***0

4.*5

**0 x *0 x 1.2 x ***9

8.*0

 

GALVANIZED SCAFFOLDING PIPE

SCAFFOLDING COUPLER

*8.3 x 4.0 x ***0

*7.*0

Double Coupler

Swivel Coupler

*8.3 x 3.6 x ***0

*4.*2

Sleeve Coupler

Inner Joint Pin

*8.3 x 3.2 x ***0

*1.*9

Putlog Coupler

Girder Coupler

*8.3 x 3.0 x ***0

*0.*1

Limpet Coupler

Ladder Clamp

*8.6 x 2.4 x ***0

*6.*9

Steel Prop

Base Jack 

Pays: China
N ° de modèle: Steel Plank
Prix FOB: 10 ~ 20 / ( Negotiable ) Obtenir le dernier prix
Localité: -
Prix de commande minimale: 10
Commande minimale: 25 Metric Ton
Packaging Detail: Standard export package
Heure de livraison: Within 20 days
Capacité de Fournir: 100000 Metric Ton per Year
Payment Type: Western Union, D/P, L/C, T/T
Groupe de produits : steel board

Send a direct inquiry to this supplier

To:

Ms. Yamin < Scaffolding and Steel pipe Co., Ltd >

Je veux savoir: