Prix FOB
Obtenir le dernier prix( Negotiable )
|25 Metric Ton Minimum Order
Pays:
China
N ° de modèle:
Frame Scaffolding System
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
Changsha
Prix de commande minimale:
-
Commande minimale:
25 Metric Ton
Packaging Detail:
Standard export package
Heure de livraison:
Within 20 days
Capacité de Fournir:
100000 Metric Ton per Year
Payment Type:
T/T, L/C, D/P, Western Union
Groupe de produits :
Personne àcontacter Ms. Yamin
No.46 Renmin East Road, Changsha, Hunan
Frame scaffolding is for small to medium
sized projects, including small or medium sized new build,
maintenance, roofing, painting and cladding. They are time
efficient, safe and stable.Â
Components:
Pre-galvanized tube, Joint Pin,
Lock Pin, Cross Brace, Base Jack or Universal Wheel.
STD/ Ledger(P.G.)mm | Size (mm) | KG | STD/ Ledger(H.D.G.)mm | Size (mm) | kg |
---|---|---|---|---|---|
Φ*2*2.2/Φ*2*2.0 | ***0****9 | *5.*5 | Φ*2*2.2/Φ*2*2 | ***0****9 | *5.*5 |
Φ*2*2.0/Φ*2*2.0 | ***0****9 | *4.*3 | Φ*2*2/Φ*2*2 | ***0****9 | *4.*3 |
Φ*2*2.1/Φ*2*2 | ***0****9 | *4.*3 | Φ*2*2.1/Φ*2*2 | ***0****9 | *4.*3 |
Φ*2*2.2/Φ*2*2 | ***0****9 | *3.*1 | Φ*2*2.2/Φ*2*2 | ***0****9 | *3.*1 |
Φ*2*2/Φ*2*2 | ***0****9 | *2.*8 | Φ*2*2/Φ*2*2 | ***0****9 | *2.*8 |
Φ*2*2.1/Φ*2*2 | ***0****9 | *3.*0 | Φ*2*2.1/Φ*2*2 | ***0****9 | *3.*0 |
Φ*2*2.2/Φ*2*2 | ***4****9 | *2.*1 | Φ*2*2.2/Φ*2*2 | ***4****9 | *2.*1 |
Φ*2*2/Φ*2*2 | ***4****9 | *1.*4 | Φ*2*2/Φ*2*2 | ***4****9 | *1.*4 |
Φ*2*2.1/Φ*2*2 | ***4****9 | *2.*0 | Φ*2*2.1/Φ*2*2 | ***4****9 | *2.*0 |
Φ*2*2.2/Φ*2*2 | **4****9 | 9.*6 | Φ*2*2.2/Φ*2*2 | **4****9 | 9.*6 |
Φ*2*2.2/Φ*2*2 | ***0****4 | *4.*9 | Φ*2*2.2/Φ*2*2 | ***0***4 | *4.*9 |
Φ*2*2/Φ*2*2 | ***0****4 | *3.*7 | Φ*2*2/Φ*2*2 | ***0***4 | *3.*7 |
Φ*2*2.2/Φ*2*2 | ***0***4 | *2.*5 | Φ*2*2.2/Φ*2*2 |  |
Pays: | China |
N ° de modèle: | Frame Scaffolding System |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | Changsha |
Prix de commande minimale: | - |
Commande minimale: | 25 Metric Ton |
Packaging Detail: | Standard export package |
Heure de livraison: | Within 20 days |
Capacité de Fournir: | 100000 Metric Ton per Year |
Payment Type: | T/T, L/C, D/P, Western Union |
Groupe de produits : | Frame scaffolding |