Prix FOB
Obtenir le dernier prix( Negotiable )
|1 Piece Minimum Order
Pays:
China
N ° de modèle:
GI-FLHB
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
1PC project LED lights in a neutral packaging box.
Heure de livraison:
For sample 4-6 days, for formal order 6-20 days
Capacité de Fournir:
20000 Unit per Month
Payment Type:
Other, PayPal, Western Union, T/T
Groupe de produits :
Personne àcontacter Mr. Justin
Room 1302,14th Building,9th Lane,Shang sha east estate, Futian District, Shenzhen, Guangdong
Quality – Our Top Priority
DLC/UL/CUL (E352762) IP65 High Bay Light
Suitable for
indoor&outdoor use: highbays, flood lights, spotlights, high
poles, stadium lights...
1.Specification chart
of project LED lights:
2.Advantages
of project LED lights:
1). The most powerful LED light
,replacing 1,000W MH/HPS
lamps
2). Universal
voltage:100-277V, 347-480VÂ
3). High quality
LEDÂ chips
4). UL/cUL
driver
5). Excellent heat sink with Copper heat
pipeÂ
6). 216°rotatable mounting
bracketÂ
7). High reflective rate of
92%Â
8). E-PTFE waterproof breathable
membrane
9). Suitable for both Indoor and
outdoor uses
10). UL/cUL
certificate (E352762) , some
are DLC listed for government
rebate
3.Feature
of project LED lights:
1). Heat and Shock
Resistant
2). Energy Savings of as Much as 90% vs Traditional Lighting
3). Reduce maintenance costs up to 90%, almost free of
maintenanceÂ
4). No UV or RF interference, NO Mercury
5). Instant start, no noise, no flickering
6). Very easy for replacement
7). Suit for both indoor and outdoor useÂ
8). Free of charges on shipping back and forward of defective
products
4. Light Distribution Curve
of project LED lights:
5.Size and dimension drawing
of project LED lights:
6.Design advantages
of project
LED lights:
7.Applications
of project LED lights:
Factory, gymnasium, lighting
decortion, square, golf course, vessel, airport, metro station,
business area, flyover, outdoor advertising, landmark and so
on.
8.Shipping information
of project
LED lights:
For sample order, the delivery time is 4-6 days after payment confrimed; for  formal order 8-20 days.Â
Remark: We are
bulding a warehouse
in USA  Erie Pennsylvania. The
lead time between order and delivery to North American customers
is shortened. The overall cost of the products to customers is
significantly decreased by ocean    freight
shipment to US warehouse from our China
factory.
Â
9.Company Information
Green Inova:Â Leader and Original designer
of LED IP65 hig bays flood ligghts in
China.
 Our expertise is manufacturing LED lighting products including LED IP65 high bays & flood light, LED retrofit kit, LED wall packs, LED canopy lights, LED Shoebox, LED Flood lights, LED PL G24 lamps etc.Â
 95% of our products are qualified
with UL,
CUL, ETL, CETL, Energy Star, DLC, CE,
ROHSÂ certificates.They are also with
different tests such LM79, LM80, IES files etc. We are committed
to providing our customers with high-tech LED Â lightings
with excellent quality and at affordable
prices.Â
10.Our services
Green Inova Services Â
1.Customize services are
available when needed.Â
2.More than 8 years experience R&D and sales engineers would
ofeer best lighting silutions for projects.
3.Best after services:Time tracking of customers' usage, collect
information to improve,fast action of dealing with problems in 48
hours.
4.Quick action of technical support and maintenance.
Pays: | China |
N ° de modèle: | GI-FLHB |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 1 Piece |
Packaging Detail: | 1PC project LED lights in a neutral packaging box. |
Heure de livraison: | For sample 4-6 days, for formal order 6-20 days |
Capacité de Fournir: | 20000 Unit per Month |
Payment Type: | Other, PayPal, Western Union, T/T |
Groupe de produits : | IP65 flood & high bays UL cULs E352762 |