Wall Pack LED By Green Inova Technology(HK) limited,
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Wall Pack LED
Next

Wall Pack LED

|

1 Acre Minimum Order

Pays:

China

N ° de modèle:

GI-WP

Prix FOB:

Localité:

China

Prix de commande minimale:

-

Commande minimale:

1 Acre

Packaging Detail:

2pcs UL cUL CE RoHS LED wall pack in a neutral packaging box.

Heure de livraison:

For sample 4-6 days, for formal order 6-20 days

Capacité de Fournir:

40000 Unit per Month

Payment Type:

Other, PayPal, Western Union, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Justin

Room 1302,14th Building,9th Lane,Shang sha east estate, Futian District, Shenzhen, Guangdong

Contacter maintenant

Spécification du produit

  • Color Temp:3000K,4100K,5500K,6000K
  • Input Voltage:AC120V;AC100-277V;347-480V
  • Power:18W-125W
  • Certification:UL/cUL(E352762); CE RoHS
  • Product Name:UL cUL CE RoHS LED wall pack
  • Sensor:Photocell sensor or PIR sensor

La description

Quality – Our Top Priority

image

1.Specifications of LED outdoor wall lights :
image

2. Advantages of LED outdoor wall lights :
1).Using high quality LED chips
2). 
Top brand LED driver
3). Universal voltage - AC100-277V ;347V~480V
4). High Power Factor >0.9, Low THD Driver
5). Positive cooling technology with fan (Sunon fan with 70,000hrs lifetime)
6). 100% Die-cast aluminum gasketed enclosure
7). Protective powder coating for lasting appearance
8). Integrated thermal management system
9). IP65 rating for outdoor use
10). Top quality with warranty of 6 years warranty
11). Available with Photocell/sensor
12). UL/cUL certificate (E352762);DLC
 
3. Feature of LED outdoor wall lights

1). Heat and Shock Resistant
2). Energy Savings of as Much as 90% vs Traditional Lighting
3). Reduce maintenance costs up to 90%, almost free of maintenance 
4). No UV or RF interference, NO Mercury
5). Instant start, no noise, no flickering.

6). Very easy for replacement
7). Suit for both indoor and outdoor use 
8). Free of charges on shipping back and forward of defective products.
 
4. Light Distribution Curve of E LED outdoor wall lights: 
image

5.Shipping information of LED outdoor wall lights:
For sample order, the delivery time is 4-6 days after payment confrimed; for  formal order 8-20 days.
Remark: We are bulding a warehouse in USA  Erie Pennsylvania. The lead time between order and delivery to North American customers is shortened. The overall cost of the products to customers is significantly decreased by ocean freight shipment to US warehouse from our China factory.

 

6.Company Information

Green Inova:
 Leader in LED retrofit kits & Original designer of retrofit kits in China.

 

Our expertise is manufacturing LED lighting products including LED retrofit kits, LED wall packs, LED canopy lights, LED Shoebox, LED IP65 high bays, LED Flood lights, LED PL G24 lamps etc.
 

95% of our products are qualified with UL, CUL, ETL, CETL, Energy Star, DLC, CE, ROHS certificates.They are also with different tests such LM79, LM80, IES files etc. We are committed to providing our customers with high-tech LED lightings with excellent quality and at affordable prices.
 

7.Our services

Green Inova Services  

1. Customize services are available when needed. 

2.More than 8 years experience R&D and sales engineers would ofeer best lighting silutions for projects.
3.Best after services:Time tracking of customers' usage, collect information to improve,fast action of dealing with problems in 48 hours.
4.Quick action of technical support and maintenance.

Pays: China
N ° de modèle: GI-WP
Prix FOB: Obtenir le dernier prix
Localité: China
Prix de commande minimale: -
Commande minimale: 1 Acre
Packaging Detail: 2pcs UL cUL CE RoHS LED wall pack in a neutral packaging box.
Heure de livraison: For sample 4-6 days, for formal order 6-20 days
Capacité de Fournir: 40000 Unit per Month
Payment Type: Other, PayPal, Western Union, T/T
Groupe de produits : LED Wall Packs DLC cULs E352762

Send a direct inquiry to this supplier

To:

Mr. Justin < Green Inova Technology(HK) limited >

Je veux savoir: