Prix FOB
Obtenir le dernier prix0.8 ~ 1.5 USD / Piece ( Negotiable )
|1 Ton Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
0.8 ~ 1.5 USD / Piece ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
0.8 per Piece
Commande minimale:
1 Ton
Packaging Detail:
Pallet or as Required
Heure de livraison:
Depends on quantity
Capacité de Fournir:
10000 Piece per Month
Payment Type:
T/T, L/C, D/P
Groupe de produits :
-
Personne àcontacter Annie
98.TIANKANG ROAD ,TIANCHANG CITY, Chuzhou, Anhui
Model NO.: CQG-FC*2
Type: Fixed
Framework: Combined Scaffolding
Lapping Form: Double Scaffolding
Move Method: Integral Lifting Scaffolding
Construction Properties: Building Scaffold
Origin: Anhui China
Material: Steel
Structural Style: Multi-Pole Scaffolding
Supporting Mode: Floor Type Scaffolding
Erection Position: External Scaffolding
Scaffolding Part Type: Scaffolding Couplers
Surface Treatment: Galvanized or Painted
Specification: SGS ELEMENTS
HS Code: ********0
function
1) construct various forms of scaffolding, templates, and other
supporting frame;
2) Tic-Tac-frame assembly;
3) the erection of ramps, sheds, stands and other temporary
structures,
4) for other types of scaffolding assistance, strengthening the
lever;
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 0.8 ~ 1.5 / Piece ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 0.8 per Piece |
Commande minimale: | 1 Ton |
Packaging Detail: | Pallet or as Required |
Heure de livraison: | Depends on quantity |
Capacité de Fournir: | 10000 Piece per Month |
Payment Type: | T/T, L/C, D/P |
Groupe de produits : | - |