Prix FOB
Obtenir le dernier prix( Negotiable )
|16 Ton Minimum Order
Pays:
China
N ° de modèle:
JXHM50E
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
16 Ton
Packaging Detail:
20L iron pail or 200L iron pails
Heure de livraison:
20 to 30 days
Capacité de Fournir:
16 Ton per Month
Payment Type:
T/T
Groupe de produits :
Personne àcontacter Ms. Becky
fengxiang, Foshan, Guangdong
Â
*0E PET Advanced Optical Transparent
Coating
  JXHM*0E is a PET advanced optical transparent coating with two-component. It mainly is apply to make the connection material of the diffusion film. The coating that adds diffusion power will form a diffusion film coating. Application   It is especially suitable for making the diffusion film for mobile phone, which is not easy to shrink, curl, excellent softness and elasticity. Technology and capability index 1. Appearance: clear or light yellow transparent sticky liquid 2. Viscosity( *0℃,mpa.s ) : ***0~***0 3. Solid content(%):*8%±2 4. pH value: 5~6.5 5. Light transmittance≥*9% Using ratio Main agent: Curing Agent (*0%Solid content)= *0:1~2 Recommended: *0:1.5 Diluent Ethyl acetate, or butyl acetate, or the mixture of ethyl acetate and butyl acetate Collocation method in order Main agent ( *0 parts ) + diluent (5 parts ~7 parts ) + diffusion powder(appropriate) and stir completely+ curing agent (1.0 parts ~ 2.0 parts) and stir completely again. Cautions 1. The formulated coating should be used up within *0 hours after it is ready-made. If continuing to use the remain, first mix the remain and the new formulated coating together, and then the mixed coating should not exceed *0 hours. (if exceed, solidification is likely to come out) 2. Using machine coating, 4 levels of increasing temperatures should be: first stage:*0~*5 ℃;second stage:*0~*5℃; third stage:*0~*0℃; fourth stage:**0~**0℃. 3. Reverse rolling after coating is finished, so that the residual solvent sufficiently volatilizes.Coating speed should be set up according to the coated object sufficiently dries off. (Coating speed as reference is ****5m/min if length of drying tunnel is *0~*5m). 4. Hardening time: after *4 hours at room temperature, then place it into in the solidification room at *5℃~*0℃ for *2 hours. 5. Cant be mix with other coatings. 6.To avoid turbidity, please clean up other types of coating, include equipped with plastic tank,plastic buckets and all tools before using the coating. 7.The process ratio in this paper is for reference only. Due to different manufactures are with different technology conditions, raw material conditions and equipment conditions, we recommend that manufactures confirm the pre-tests or consult with us before using. Our products are only sold according to general condition. 8. According to customer demand for products, we can make the overall design of the program,including modifying the product formulation and setting the process methods. |
Pays: | China |
N ° de modèle: | JXHM50E |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 16 Ton |
Packaging Detail: | 20L iron pail or 200L iron pails |
Heure de livraison: | 20 to 30 days |
Capacité de Fournir: | 16 Ton per Month |
Payment Type: | T/T |
Groupe de produits : | adhesive |