Prix FOB
Obtenir le dernier prix( Negotiable )
|16 Ton Minimum Order
Pays:
China
N ° de modèle:
JXHM504-2
Prix FOB:
( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
-
Commande minimale:
16 Ton
Packaging Detail:
20L iron pail
Heure de livraison:
20 to 30 days
Capacité de Fournir:
16 Ton per Month
Payment Type:
T/T
Groupe de produits :
Personne àcontacter Ms. Becky
fengxiang, Foshan, Guangdong
**4 *2 lamination
Adhesive (Metal/PVC or PET) Application   It is suitable for lamination between metal and other matericals such as PVC sheet,PET sheet and so on. Â
Technical
performance
Â
Process condition of ****2 1.Metal plate should be washed by acid or alkali, and then clean it with water. Finally dry it. 2.This product can be coated on the metal plate or the film (except PVC film). Note: the adhesive must be coated on the metal plate only when compounding metal plate with PVC film. 3.Ratio for reference:main agent: diluent: curing agent(solid content: (*5%±2))=*0:5~8:1~2.5. 4.Diluent is the mixture of Ethyl acetate and cyclohexanone (ratio:1:1) ,when the metal plate combines with PVC film.Or else,you can use ethyl acetate or butyl acetate as diluent only. 5.The amount of coated adhesive:coating amount(dry basis) can be chosen from 4.0g /m2 to *0.0g/m2, depending on the smoothness of composite. When PVC films laminate with metal,you should choose *0 g/m2. 6.Temperature of Drying Tunnel:first stage:*0℃~*0℃; second stage:*0℃ ~*0℃; third stage:*0℃~*0℃ 7.Temperature of pressing roll:*0°C~**0°C can be chosen,if the deformation condition of films is unaffected. 8.Not Suitable for compound PVC in high temperature, so you can choose normal temperature or *0°C below. 9.Dry the PET-Metal composite(no solvent left). *0.According to customer demand for products, we can make the overall design of the program, including modifying the product formulation and setting the process methods. |
Pays: | China |
N ° de modèle: | JXHM504-2 |
Prix FOB: | ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | - |
Commande minimale: | 16 Ton |
Packaging Detail: | 20L iron pail |
Heure de livraison: | 20 to 30 days |
Capacité de Fournir: | 16 Ton per Month |
Payment Type: | T/T |
Groupe de produits : | adhesive |