Prix FOB
Obtenir le dernier prix269241 ~ 269300 USD / Set ( Negotiable )
|2 Set Minimum Order
Pays:
China
N ° de modèle:
-
Prix FOB:
269241 ~ 269300 USD / Set ( Negotiable )Obtenir le dernier prix
Localité:
-
Prix de commande minimale:
269241 per Set
Commande minimale:
2 Set
Packaging Detail:
-
Heure de livraison:
-
Capacité de Fournir:
100 Set per Month
Payment Type:
Other
Groupe de produits :
-
Personne àcontacter dengyaowen
Wuhan, Hubei
It is mainly used in railway line construction, and has the functions of pillow replacement, square pillow, ballasting, excavation, tamping, trimming and lifting. With the dual-purpose running mechanism of highway and railway, the running speed is fast and the power is high, which is suitable for construction under various working conditions, especially for the working environment that requires long-distance back-and-forth operation, such as demolition of old stations and yards, pillow replacement of long bridges and tunnels, etc., including pillow replacement device.
Pays: | China |
N ° de modèle: | - |
Prix FOB: | 269241 ~ 269300 / Set ( Negotiable ) Obtenir le dernier prix |
Localité: | - |
Prix de commande minimale: | 269241 per Set |
Commande minimale: | 2 Set |
Packaging Detail: | - |
Heure de livraison: | - |
Capacité de Fournir: | 100 Set per Month |
Payment Type: | Other |
Groupe de produits : | - |