FOB Price
Obtenir le dernier prix2800 ~ 40000 / Set ( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Set
Packaging Detail:
Packed with plastic film.
Delivery Time:
30-60 days after received 30% deposit payment
Supplying Ability:
190 Set per Year
Payment Type:
T/T, L/C, Western Union
Personne àcontacter Mr. Steven
Shifang Road, Shijiazhuang, Hebei
Model | ZD**0G | ZD***0G | ZD***0G | ZD***0G |
Nail diameter (mm) | **3.5 | **3.5 | 2.**4.5 | 2.**5 |
Nail length (mm) | ****0 | *****0 | *****0 | *****0 |
Speed (pcs/minute) | ≤**0 | ≤**0 | ≤******0 | ≤**0 |
Motor (kw) | 5.5*1.5 | 5.5*1.5 | 7.5*2.2 | *1*2.2 |
Overall size (m) | 1.5*1.2*1.1 | 1.5*1.2*1.1 | 1.6*1.1*1.3 | 1.6*1.2*1.3 |
1.6*0.9*1.6 | 1.6*0.9*1.6 | 1.6*0.9*1.7 | 1.6*0.9*1.7 | |
0.4*0.8*0.9 | 0.4*0.8*0.9 | 0.4*0.8*0.9 | 0.4*0.8*0.9 | |
Weight | ***0 | ***0 | ***0 | ***0 |
Model | ZD*1C | ZD-2c | ZD-3c | ZD-4c | ZD-5c |
Nail length (mm) | ≤*5 | ≤*0 | ≤*5 | ≤**0 | ≤**0 |
Nail diameter (mm) | ≤1.4 | ≤2.5 | ≤3.2 | ≤5.0 | ≤5.5 |
Speed(pcs/min) | **0 | **0 | **0 | **0 | **0 |
Motor(kw) | 1.5 | 2.2 | 3 | 5.5 | 7.5 |
Weight(kg) | **0 | ***0 | ***0 | ***0 | ***0 |
Dimension (cm) | **5x*0x**0 | **0x**5x**0 | **9x**0x**5 | **0x**0x**0 | **0x**5x**0 |