AA and AAA Alkaline Battery Production Line and Equipment By Wuxi Norshun Intelligent Equipment Co. , Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
AA and AAA Alkaline Battery Production Line and Equipment

AA and AAA Alkaline Battery Production Line and Equipment

400000 / Piece

|

Minimum Order

Localit:

中�

Prix de commande minimale:

Commande minimale:

1 Piece

Packaging Detail:

�箱

Delivery Time:

6个&Atild

Supplying Ability:

100 Piece per Day

Payment Type:

T/T

Contacter maintenant
Membre gratuit

Personne à contacter bing

qianzhou, Wuxi, Jiangsu

Contacter maintenant

Description

Manufacturer\'s direct sale of AA and AAA alkaline battery production line and production equipment as well as various accessories. I. of the Alkaline Battery Production Line 1. Design speed: **0 units/minute 2. Total power: Approximately *2KW3. Total weight: Approximately *5 tons 4. Dimensions: (L×W×H) ****0×**0×***0mm II. Equipment Composition of the Alkaline Battery Production Line 1. Ringing machine 2. Ring insertion machine . Upper mold sleeve machine 4. Glue coating machine 5. Electrolyte adding machine 6. Liquid absorption platform 7. Lower mold sleeve machine8. Nail insertion machine 9. Edge rolling machine *0. Disk loading machine III. Main Auxiliary Equipment of the Alkaline Battery Production Line1. Dust collector for the production line 2. Positive electrode production line 3. Dust collector for the positive electrode production line 4. Battery spot welding 5. Battery assembly machine 6. Battery inkjet machine 7. Battery testing machine 8. Negative electrode production line 9. Battery paper rolling *0. Battery disk loading machine *1. Battery energy ring *2. Battery mold sleeve IV. Commissioning of the Alkaline Production Line 1. Prepare for the no-load operation commissioning of the equipment. 2. Commissioning steps are as follows: (1) Adjust the dust controller to ensure the correct sequence of actions for the electromagnetic pulse valve and the correct order of dust cleaning units. (2) Check the voltage of the electromagnetic pulse and the electrical control part (*4V or **0V). (3) Check if the seals on the equipment are loose or fallen off. 4) The pressure of the compressed air for spraying should be kept at 5~7㎏/cm². (5) Check if the motors and mechanical parts on the equipment are running normally. (6) Check if the screws on the equipment are tight. (7) Conduct a no-load operation commissioning of equipment, requiring all parts to run normally. (8) Conduct a load operation commissioning of the equipment. Require all parts to run normally and adjust the dust cycle according to the changes in equipment operation resistance (resistance method or timing method).
 

Send a direct inquiry to this supplier

To:

bing < Wuxi Norshun Intelligent Equipment Co. , Ltd. >

Je veux savoir: