Wire rope suspended platform for building construction ZLP630 By Gaotang Boshun Fitness Equipment Co., Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Wire rope suspended platform for building construction ZLP630

Wire rope suspended platform for building construction ZLP630

1900 ~ 2000 / Set ( Negotiable )

|

Minimum Order

Localité:

-

Prix de commande minimale:

Commande minimale:

1 Set

Packaging Detail:

Pallet

Delivery Time:

15-20 days

Supplying Ability:

500 Set per Month

Payment Type:

T/T

Contacter maintenant
Membre gratuit

Personne à contacter Mary

Linyi, Shandong

Contacter maintenant

Description

Usage and Application:
ZLP series Suspended Platform belongs to high-rise working construction machinery, mainly used to install curtain wall, facade cleaning or other works such as plaster pulp, veneer, paint coatings, oil paint, or cleaning and maintenance, etc., can also be used for large tanks, bridges, dams and other construction operations.
1.Working Platform:Steel + Galvanized

  1. Working Cage is the workplace at heights for the workers.
  2. L=6 m (2*2*2) or (1.5*2*2.5)ï¼› W=0.*9 mï¼› H=1.*7 m/1.*7m
2.Suspension Mechanism:Surface with Hot-dipped Galvanized
Suspension mechanism is on the top of the building to suspend the platforms through the steel rope.
3.Components:
Hoist, LTD6*0, 1.5kw, 2pcs
Safety Lock, LSF*0A, 2pcs
Electric Control Box: 1pc
Steel Rope: 4pcs, **0m/pc, D=8.3mm
Electric Cable: 1pc, **0m/pc, , 2.0mmsq
Safety Rope: 1pc; **0m/pc,
Counterweight (Optional): *0pcs, *5kg/pc

Send a direct inquiry to this supplier

To:

Mary < Gaotang Boshun Fitness Equipment Co., Ltd. >

Je veux savoir: