FOB Price
Obtenir le dernier prix650 ~ 800 / Piece
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
With wooden pallets
Delivery Time:
15-45 Days
Supplying Ability:
3000 Piece per Month
Payment Type:
L/C, T/T
Personne àcontacter Ms. kate
wanghai mansion, Tianjin, Tianjin
Cone
crusher main parts include frame structure, the horizontal axis,
moving cone, balancing wheel, eccentric, concave(fixed cone liner),
broken wall (dynamic cone liner), fluid couplings, lubrication
several parts system, hydraulic system, control system, in which
concave and broken wall are the most common wear-resistant
parts.