FOB Price
Obtenir le dernier prix6000 ~ 5000 / Piece
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
iron box package
Delivery Time:
15 days after confirmed PO
Supplying Ability:
200 Piece per Month
Payment Type:
T/T, L/C
Personne àcontacter Mr. jack
No.99 Tonghai Avenue, Nanjing, Jiangsu
No. | Item name | Unit | MN-C**0 |
1 | Sweeping paths | mm | >1*00 |
2 | Productivity | m2/h | >***0 |
3 | Max climbing capacity | % | *0 |
4 | Main brushs length | mm | **0 |
5 | Power supply | V | *8 |
6 | Continuous working time | H | **6 |
7 | Waste hopper capacity | L | 1*0 |
8 | Side brushs diameter | mm | **0 |
9 | Driving power | W | ***0 |
*0 | Operation power | W | **0***0**0*2**0 |
*1 | Turn radius | mm | ***0 (spot turn) |
*2 | Dimensions(L/W/H) | m | 1.6*1.3*1.4 |
*3 | Working speed | km/h | 6 |
*4 | Driving speed | km/h | 8 |
*5 | Filter surface | m2 | 5 |
*6 | Net weight | kg | **0 |