FOB Price
Obtenir le dernier prix50000 ~ 100000 / Set ( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Set
Packaging Detail:
Container
Delivery Time:
60 days
Supplying Ability:
15 Set per Month
Payment Type:
T/T
Personne àcontacter Dwight
Baoantun Village,Shawa Industrical Area,Hejian City., Cangzhou, Hebei
Laying Up Machine for 3 / 4 / 5 (Core) Power Cables Core Laying-up Machine | BH Machines
Laying up Machine
Model (Laying-up Machine) | JGL***0/3*3 | JGL***0/3*3 | JGL****0/3*1*1 | JGL****0/3*1*1 | JGL****0/3*1*1 | |
Diameter of single wire | φ***0 mm | φ***2 mm | φ***0mm |  φ***5 mm | φ****5 mm | |
Maximum stranded conductor OD | φ*0 mm | φ*0 mm | φ*3 mm | φ*0 mm | φ*0 mm | |
Stranding Pitch | *****0 mm | ******0 mm | *******0 mm | *******0 mm | *******6 mm | |
Capstan | Capstan Wheel Diameter | ***0 mm | ***0 mm | ***0 mm | ***0 mm | ***0 mm |
Maximum Haul-off Force | *0 T | *2 T | *5 T | *0 T | *5 T | |
Motor Power | *8.5 KW | *2 KW | *0 KW | *7 KW | *5 KW | |
Bobbin Size | **0 mm | **0 mm | ***0 mm | ***0 mm | ***0 mm | |
Take-up Bobbin | ***0 mm |  ***0 mm |  ***0 mm | ***0 mm | ***0 mm | |
Maximum Haul-off Linear Speed |  *0 m/min |  *0 m/min | *4 m/min |  *8 m/min | *1 m/min | |
Central Height | ***0 mm | ***0 mm | ***0 mm | ***0 mm | ***0 mm |