Popular Energy Saving Long Led Tube Bulb By Dongguan City Everlight Co. Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Popular Energy Saving Long Led Tube Bulb

Popular Energy Saving Long Led Tube Bulb

2.58 ~ 3.08 / Piece

|

Minimum Order

Localité:

Chins

Prix de commande minimale:

Commande minimale:

1000 Piece

Packaging Detail:

White box,

Delivery Time:

25 - 30 days

Supplying Ability:

5000 Piece per Week

Payment Type:

T/T, Western Union, PayPal

Contacter maintenant
Membre gratuit

Personne à contacter Eve

Qishi Town, Dongguan, Guangdong

Contacter maintenant

Description

Advantage
1.Dimmable,Epistar Chip,CC driver,high CRI>*0
2.High lumen ******0lm/w
3.Finish: Clear,Frosted,Milky,Gold,Silver
 
Specification
Model LEDFB-T***4s 
watt 2.5 W
lumen **0 - **0 Lm
voltage **0V
Color Rendering Index >*0 Ra
Color temperature ***0 K
base E*7
lifespan More than ****0 hrs
dimmable yes
chips Epistar / Sanan
​
Features
1) **0 degree full light angle
2) Perfectly replace the traditional Edison bulbs
3) High luminous flux which can reach up to ******0lm/w
4) High quality with CE&RoHS&UL
5) No UR,no radiation,No risk of mercury emission, environmental friendly. 
6)Up to *5% energy saving
7)Good CRI to display original color of objects: Ra≥*0
8)Filament made of Sapphire Substrate,more excellent performance
9)Excellent heat sink design
*0)Fashion design and different types
*1)Easy to install and use
*2)Superior high quality bulb with ****0 hours warranty


Packing & Shipping
Packagin Detils: White box, color box or color card&blister designed by Customer , Welcome OEM package. 
Delivery Details: **7 days for sample,*5-*0working days for bulk order. 
 
 
 
How we make led filament bulbs: 
1. Test & filter the COB filament
2. Assemble & weld the filament
3. Seal the bulb & nitrogen filling
4. Fix the constant current driver
5. The filament bulb testing & aging
6. Packaged & ready for shipping

Send a direct inquiry to this supplier

To:

Eve < Dongguan City Everlight Co. Ltd. >

Je veux savoir: