Collector Cam Bearing By Omeroglu Metallurgy Co.Ltd., Turkey
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Collector Cam Bearing

Collector Cam Bearing

2 ~ 8 / Kilogram

|

Minimum Order

Localité:

-

Prix de commande minimale:

Commande minimale:

10000 Kilogram

Packaging Detail:

Bigbag, wooden box

Delivery Time:

Max 20 days after payment received5-7 days

Supplying Ability:

60000 Kilogram per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Kadir

T.Ziyaeddin Cd.No:31, Konya, Konya

Contacter maintenant

Description

Omeroglu Metalurji Makine Hird.Nakl.Ä°nÅŸ.San. ve Tic.Ltd.Åžti", we have involved iron, ductile (nodular) iron and steel casting business since ***1.Our company owners exprience on casting business is for more then *0 years.Our product are agricultural equipment parts,automotive parts,valves,elevator system and machinery parts and etc.We are casting valve bodies,flanges,agricultural machinery parts such as gearbox bodies, frontal covers,rear covers,rods,gears and etc... for world renowned Turkish companies.Our casting capacity per unit is between 1 kg to 5 tons.As i mention before we are custom manufacturer for Turkish renowned valve producers like GeliÅŸim,Batusan and many more. We glady want to work with you and become your supplier as well.Wish this mail be the frst step of business partnership.Here below you can find info about our manufacturing process and some pictures.Painted parts in the pictures attached are the final products which are precision machined by our customers and are taken from their website.
 
Manufacturing Schedule;
 
Our typical manufacturing schedule starts with the recieving order from our customers. According to the order ,it requires to prepare the raw materials such as pig iron,scrap steel etc. And also requires manufactured materials such as cores.
So pattern and core boxes which has been sent from our customers are prepped for the production.
Core room starts working first, and gets cores ready for molds which are being made.Meanwhile mold halves ( upper and lower ) are made and placed to the assembly area.At the assembly area, molds are flow coated and cores are set in place. The mold is then closed up for pouring.
After molds are staged on line,melted raw materials with our electircal induction furnace brougth to the molds and pouring process starts. Once poured, the molds are allowed to cool before next being sent to the shakeout. At the shakeout, the castings are separated from the sand mold. The sand is sent to a reclamation system so that it can be reused in the molding process.After shakeout is done,castings are sent to the cleaning room where they are prepared for costumers specifications. Processing in the cleaning room includes shot blasting, cut-off, welding, heat treating and inspection.
 
 

Send a direct inquiry to this supplier

To:

Mr. Kadir < Omeroglu Metallurgy Co.Ltd. >

Je veux savoir: