FOB Price
Obtenir le dernier prix2 ~ 5 / Set ( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Twenty-Foot Container
Packaging Detail:
as reqruirement
Delivery Time:
30days
Supplying Ability:
1000 Ton per Month
Payment Type:
T/T, L/C
China
Personne àcontacter Leon
Tianjin, Tianjin
DL Industry Group Limited committed to excellence and development scaffolding business including Frame System, Steel Prop System, Cuplock System, Ringlock System, Plank Serious and Scaffolding Accessory.
Whatpp/viber: *0 *6 ****0
**3 **3
Name | Scaffolding |
Material | Carbon structure steel Q**5 Q**5, Q**5 |
Surface Treatment | Hot dip galvanized, Galvanized, Zinc plated, Powder coated, Dip painted, Painted |
Color | Silver, Orange, Red, or as your request |
Service | OEM service available |
MOQ | 1**0GP |
Payment | T/T, L/C, Western Union, MoneyGram |
Delivery Time | About ****0 days after confirmation |
Packing | In bulk, steel pallet or as your request |
Production Capability | **0 tons per day |
Manufactory Location | Tianjin, China |
Test: | SGS, BV or as per your request |
Color | White zinc, red, blue |
Manufacture Process | Pipe rolling & cutting-ring pressing & ledger clamp casting-automatic arc welding-acid cleaning-hot dip galvanizing-packing |
Standard Length | ***0mm, ***0mm, ***0mm, ***0mm, ***0mm, **0mm or customized |
Ledger Length | ***0mm, ***0mm, ***0mm, ***0mm, ***0mm,***0mm or customized |
Rosette Intervals | **0mm or customized |
Rosetter thickness | *0mm or customized |
Tube Diameter | *8mm or customized |
Tube thickness | 3.*5mm or customized |