FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
Hebi
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
container or other
Delivery Time:
30 days after receipt of advance payment.
Supplying Ability:
120 Set per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Personne àcontacter judith
Shilin Town Northern Industrial Zone, Middle of Tanghe Road, Shancheng District, Hebi, Henan, China., Hebi, Henan
2 JK*3 x 1.5 P single rope winding mine hoist | ||
Winding Drum | Diameter (m) | 3.0 |
Number | 2 | |
Width(m) | 1.5 | |
Two drum center distance(m) | 1.*9 | |
Steel rope max.static tension force | Man-Carrying(KN) | **0 |
Stuff-Carrying(KN) | **5 | |
Steel rope max.static tension force differential | Man-Carrying(KN) | *0 |
Stuff-Carrying(KN) | *0 | |
Steel Wire Rope | Max.Diameter(mm) | *6 |
Breaking force (KN) | **0 | |
Max.Lifting height or transport length | First Layer Intertwine(m) | **2 |
Second Layer Intertwine(m) | **3 | |
Third Layer Intertwine(m) | **3 | |
Reduction Ratio | *1.5 | |
Max.Lifting Speed m/s | 3.7 | |
Electric Motor | Rotate speed(r/min) | **0 |
Max. Power (KW) | **0 | |
Overall diameter Length×Width×Height | ****7×***0×***0 | |
Weight(kg) | ****0 |