FOB Price
Obtenir le dernier prix280 ~ 330 / Cubic Meter
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
21 Cubic Meter
Packaging Detail:
pallet
Delivery Time:
two weeks
Supplying Ability:
700 Cubic Meter per Day
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
China
Personne àcontacter Mr. Jason
guangrao economic development zone, Dongying, Shandong
Properties |
Test Method / Unit |
Classification | MDF |
MDF REG |
MDF MR |
MDF HMR |
MDF EXT |
---|---|---|---|---|---|---|---|
Perforator Method |
GB/T *********9 mg/**0g |
E1≤8.0 | √ | √ | √ | √ | √ |
E2>8.0≤*0 | √ | √ | √ | √ | √ | ||
E3>*0 | |||||||
Desiccators Method |
JIS A ***0 mg/L |
F**** Ave ≤ 0.3 Max ≤0.4 |
√ | √ | √ | √ | √ |
F***(E0) Ave ≤ 0.5 Max ≤0.7 |
√ | √ | √ | √ | √ | ||
F** Ave ≤1.5. Max ≤2.1 |
√ | √ | √ | √ | √ | ||
F* >2.1 | √ | √ | √ | √ | √ | ||
CARB (Small Chamber Method) |
ASTM D ***7 ppm |
Phase 2 MDF Thin Board < 8mm < 0.*3 |
√ | √ | √ | √ | √ |
Phase 2 MDF Thick Board > 8mm < 0.*1 |
√ | √ | √ | √ | √ |