FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
standard export package
Delivery Time:
20days after receiving deposite or L/C at sight
Supplying Ability:
1000 Acre per Month
Payment Type:
-
Personne àcontacter Ms. Grace
yanqing yiji road, Qingdao, Shandong
Waterline front system |
filter pressure regulating valve water meter medicator(doser) |
Water pipe with nipple drinker and drip cup |
Nipple distance:
*6 nipples/4m, *2 nipples/3m Raising ability: ***2 birds/pc Nipple material: inside valve is made of stainless steel, shell is made of plastic Drip cup material: pure engineering plastic |
Suspension lifting device | We can adjust the drinking line by winch. |
Waterline end module | water display tube, etc |