Edm die sinking machine screw remover By Luoyang Xincheng precision Machinery Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Edm die sinking machine screw remover

Edm die sinking machine screw remover

1100 ~ 1299 / Set

|

Minimum Order

Localité:

Henan, China

Prix de commande minimale:

Commande minimale:

1 Set

Packaging Detail:

Two layer of thick carton packaged, surrounded by foam filled to protact the machine, five straps ti

Delivery Time:

within 72 hours after 100% advanced T/T deposit ch

Supplying Ability:

300 Set per Month

Payment Type:

T/T, Western Union, PayPal

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Amy

No 198 Jiudu Road, Luoyang, Henan

Contacter maintenant

Description

Product Description
1.Small size, light weight, convenient to operating;
2.Electrolytic Corrosion principle, no damage to workpiece
3.Magnetic base, easily to attract on the workpiece
4.Cooling fan installed keep the machine contiinue working
5.Working head is separated, helpful for complex machining
6.Alarm automatically for preset depth.

Product Specification
Name    **********************- Screw extractor EDM*8C
Input Voltage (V)*************- AC**0V *0/ *0Hz
Secondary Output Voltage (V)**- ****0
Electrode Diameter Range******- ***0mm
Max Travel of working head (mm)- *0mm
Max Processing Speed(mm/ min)**- 1mm/min
Working Liquid ***************- Tap water
Power Frequency     **************- *0Hz
Remove Taps Sizes(mm)**********- M*-M*0
Machine Size (L*W*H mm)    *******- **0***0***0mm
Package size ******************- **8***8***2mm
Net weight(KG) ***************- *4KG
Gross weight ****************- *6KG
Function***********************- Remove broken taps, dreamers and screws.

Package: 
Two layer of thick carton packaged, surrounded by foam filled to protact the machine, five straps tie up on the outer carton. 

Delivery:
We usually arrange the goods within *2 hours after **0% advanced T/T deposit checked

Shipment: 
The shipment is usually International express DHL / FEDEX / TNT...etc

Send a direct inquiry to this supplier

To:

Ms. Amy < Luoyang Xincheng precision Machinery Co., Ltd >

Je veux savoir: