FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
linyi china
Prix de commande minimale:
-
Commande minimale:
22 Cubic Meter
Packaging Detail:
In wood pallets, Inner plastic bags, outer paper-box, wrapped with steel tapes by 4x6 lines for rein
Delivery Time:
15 days
Supplying Ability:
4000 Cubic Meter per Day
Payment Type:
T/T, L/C, Other
Personne àcontacter Bonnine
Zhubao industrial park, Yitang town, Linyi, Shandong
Advantage |
Tight construction and high strength; No rotten
or decay, strong against corrosion and
fire; Â Low formaldehyde emission; Good nailing strength, easy to be sawn, nailed, drilled, grooved, Â planed, polished; Good heat and sound resistant, easy to be coated. |
 |
 | ||
 | ||
Loading quantity |  9MM , **0pcs/pallet,*6pallets/*0'GP,***0pcs/*0'GP |  |
*2MM,*5pcs/pallet,*6pallets/*0'GP,***0pcs/*0'GP |  | |
*4MM,*5pcs/pallet,*6pallets/*0'GP,***0pcs/*0'GP |  | |
*5MM,*0pcs/pallet,*6pallets/*0'GP,**0 pcs/*0'GP |  | |
*6MM,*7pcs/pallet,*6pallets/*0'GP,**2pcs/*0'GP |  | |
*8MM,*0pcs/pallet,*6pallets/*0'GP,**0 pcs/*0'GP |  | |
Payment | T/T, *0% down payment, pay the balance by copy of B/L.Or sight L/C | Â |
Packing | In wood pallets, Inner plastic bags, outer paper-box, wrapped with steel tapes by 4x6 lines for reinforce | Â |
Mini order | Advise one *0'ct | Â |
Delivery time | Within *5 days after receiving down payment | Â |