FOB Price
Obtenir le dernier prix1 ~ 2 / Case ( Negotiable )
|Minimum Order
Localité:
wuhan
Prix de commande minimale:
Commande minimale:
1 Case
Packaging Detail:
wooden case
Delivery Time:
7 working days
Supplying Ability:
100 Case per Week
Payment Type:
T/T
Personne àcontacter shuyue
Wuhan, Hubei
HYYJ***2
Â
1 |
high voltage insulation test breakdown test |
2 |
Proof test |
3 |
IEC****6/IS***2/BS***4Â test |
4 |
ASTM D***6 standard test ASTM D**7 standard test |
5 |
5 minutes standard test |
6 |
Manual test |
7 |
Calibration interface for customers, result print |
8 |
Uploading data to PC and making word report automatically. |
(1) AC**0V±*0% power supply input
(2) Output voltage:AC 0V~**0KV
(3) Rate of voltage rise: 0.5kv/s±*0%, 2kv/s±5%, 3kv/s±5%,5kv/s±5%
(4) Max test times: 9
(5) Init wait times:0~**9s
(6) Stir time: 0~**9s
(7) Wait time: 0~**9s
(8) Measurement accuracy: ±(1% of full scale + 2 digits) Resolution:0.1KV
(9) Temperature measurement:
Measurement range : 0°C to *0°C, or better
(*0)Storage:**0 groups
(*1)7 inch colorful LCD with touch pad
(*2)Oil test vessel temperature measurement unit
Â