Hydraulic Guardrail Pile Driving Machine By Nanjing Roadsky Traffic Facility Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Hydraulic Guardrail Pile Driving Machine

Hydraulic Guardrail Pile Driving Machine

1 ~ 20000 / Set ( Negotiable )

|

Minimum Order

Localité:

-

Prix de commande minimale:

Commande minimale:

1 Set

Packaging Detail:

Export and sea-worth Special Packing

Delivery Time:

7-10 days after receiving advanced payment

Supplying Ability:

30 Set per Month

Payment Type:

Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Bella

NO.76 PANXIN ROAD, PUKOU, Nanjing, Jiangsu

Contacter maintenant

Description

Hydraulic Guardrail Pile Driving Machine

 

1.Functions


1.1 Pile Driving Function: YW Series Pile Driver is designed to install and maintain highway anti-collision guard rails and solar posts, and is especially applicable for driving the guardrail post in newly constructing highways. It is also used for the installation of photovoltaics (PV), solar cells and panels.


1.2 Pile Extracting Function: With the same hydraulic system for extracting poorly driven or incorrectly positioned posts in road maintenance work, it is a professional machine for the extraction of posts from any surface condition.


1.3 Pile Drilling Function: This equipment can drill holes into concrete, rock, granite and other very hard road materials, and then easily install the posts.



2.Features


 

2.1 YW Series Pile Driver is composed of the chassis, guide rail, hydraulic system, hydraulic hammer, diesel engine, electrical, cooling and control system, pile extracting equipment and pile drilling equipment. Its characteristics include quick and exact positioning, compact size, lightweight, self-propelled, agile, ergonomic design, easy operation, high efficiency and a low price.


2.2 The tow bar is connected with the chassis. In using a tow truck or trailer to tow the machine to the work site, first it is needed to lay down the tow bar and its chain disassembled. The up and down, longitudinal and transverse shift, horizontal slide of the guide rail are controlled by the hydraulic system.


2.3 The hydraulic hammer is installed onto guide rail. The hydraulic system carries the hammer or pile drilling equipment downward and upward along the guide rail for pile driving or drilling. You can use the upward force of the hammer to directly extract the posts out of the ground; however there isnt a great amount of upwards force and so, we suggest you to choose our professional Pile Extractor for extracting the posts from the ground.


2.4 It has very famous Changchai brand diesel engine with electric starting equipped, has stable performance, simple operation and maintenance and a very long service life.


2.5 The control system is equipped with multidirectional control valves and centralized hydraulic control rods which make the operation simple and convenient.


2.6 It can install piles up to 3m (9.*4) in length, but on request the machine can be supplied with extension guide rail which can install piles up to 3.5m (*1.*8) or even 4m (*3.*2) long.


2.7 The pile drilling motor is hydraulically operated and the drill is pneumatically operated with an air compressor. The drilling equipment comprises of a hydraulic motor, connecting device, connecting rod, pneumatic percussion hammer and a drill bit.

 

 

3.Advantages


 

3.1 Systems are simple; while individual units are robust, repairs to nearly any component can be made by any mechanic.

 

3.2 Parts for repairs are readily available.

 

3.3 Interchangeablity of parts is supported by all models.

 

3.4 Similarities to other machines currently in use by customers ensure that further training in the usage of these tools is unnecessary.
 

3.5 Supplying power and fuel to these systems is very feasible at construction sites.
 

Send a direct inquiry to this supplier

To:

Ms. Bella < Nanjing Roadsky Traffic Facility Co., Ltd >

Je veux savoir: