Wholesale Aluminum Formwork System By Suntown Group, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Wholesale Aluminum Formwork System

Wholesale Aluminum Formwork System

210 ~ 220 / Square Meter ( Negotiable )

|

Minimum Order

Localit:

-

Prix de commande minimale:

Commande minimale:

1000 Square Meter

Packaging Detail:

as per client's request

Delivery Time:

30 days at contract signature

Supplying Ability:

120000 Square Meter per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Coco

长沙市金星大道, Changsha, Hunan

Contacter maintenant

Description

Ten Advantages
1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel. With weight of *0KG/square meter,Aluminum formwork is the lightest formwork for construction, which makes for easy handling.

2. Various sizes, high accuracy
The construction drawing is designed with strict structure, with little measurement error and high accuracy, which is very suitable for high rise buildings.

3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.

4. Long time used
With the lowest average lost, aluminum formworks can be used up to **0 times.

5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

6. Excellent quality
The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

7. High Efficiency
According to different climatic conditions, the formworks can be removed in ****6 hours.

8. Recyclable value
The used aluminum material is of greater recyclable value, several times higher than steel.

9. Independent support system
The gap between the formwork support is totally enough for passing, moving, and pulling.

*0. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

 

Send a direct inquiry to this supplier

To:

Coco < Suntown Group >

Je veux savoir: