FOB Price
Obtenir le dernier prix5000 ~ 20000 / Set ( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
Commande minimale:
1 Set
Packaging Detail:
curtain and wooden crate
Delivery Time:
30 workdays for OEM, 7 days for ready goods
Supplying Ability:
6000 Set per Year
Payment Type:
T/T
Personne àcontacter Andy
Xinxiang, Henan
Type: LDA model single girder overhead crane
Lifting capacity: ***0t
Span: 7.***2.5m. Non-standard design can also be caught out
according your requirement.
Structure:
The bridge: traverses on the runway;
The hoist: traverses on the bridge and lifts up and down;
The runway: tied to the building structure.
Application: LDA
model Single girder bridge crane is one kind of light duty crane
Standard , the working duty is A3! This product is Widely used to
transport, assemble, check and repair as well as load and unload at
workshop, warehouses, and goods yard, etc. It is prohibited to use
the equipment in the combustible, explosive to corrosives
environment
Product detail
description:
1. Main beam: One-time- forming on the main girder. This result in
lower dead weight with a high degree of vertical and horizontal
rigidity and smaller wheel load being transmitted to the crane
runway. Which also can reduce distortion in conveying; make sure
the accuracy; improve the machine\'s strength and working
efficiency. One-body shaped, No welding for main beam box!
2. End carriage: Crane travelling system, Motor-Reducer-Wheel
driven system! motor used soft start motor which result in very
stable starting!
3. Lifting mechanism: Monorail electric hoist. There are two kinds
could be optional, CD model with single lifting speed, MD model
with double lifting speed!
4. Electrical equipment: Electric systems are brand !
5. Motor: motor brand for hoist and traveling are Nanjing special
brand, the top brand in China!
6. Gear box: Tailong or Taixing brand, Top brand on heavy duty
gearbox!
7. Long service life with a low-maintenance.
Safety
features
Overload protection: If the materials or electric current overstep
the capacity, the crane will give a sharp warning for protection
itself.
Emergency brake: If there is emergency situation, it could stop the
crane to protect operator and goods.
Rubber buffers.