AAC block machinery By Shandong Wanda Heavy Industry Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
AAC block machinery

AAC block machinery

510000 ~ 900000 / Set

|

Minimum Order

Localit:

-

Prix de commande minimale:

Commande minimale:

1 Set

Packaging Detail:

WOODEN BOX

Delivery Time:

30 DAYS AFTER RECEIVE THE PAYMENT

Supplying Ability:

10 Set per Month

Payment Type:

L/C, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Mr. fanny

GaoTang, Liaocheng, Shandong

Contacter maintenant

Description

   AAC line working process introduce

 (1) first the loader load sand material into material hopper, the sand through belt conveyer enter into ball mill machine to crush into powder slurry. in the crushing process ,water will be add into ball mill machine in the same time . so finally ball mill machine will produce sand slurry.

 (2) after sand slurry out of ball mill machine enter into concrete pit,slurry will be send into twoslurry store mixerthroughslurry pump.

 (3) when we need slurry to batch ,the slurry be released fromslurry store mixerand enter into slurry pit which under theslurry store mixer.There have anotherslurry pumptake sand slurry enter intoslurry measure scale automatically,In the same time,the lime,cement,gypsum will be add intolime cement gypsum measure scaleautomatically one by one.

After sand,lime,cement,gypsum finish measure,they will be add intoslurry pouring mixer automatically,in the same time,the aluminum will be add into slurry pouring mixerby manual after manual scale measure . when all material mixing in theslurry store mixer, after **6 minutes mixing , all material will be pour intoMould box.In the batching material process,except aluminum is add by manual ,other working process is automatic to do by PLC system in control room .

 (4) after slurry be pour into mould box,frequency conversion pouring ferry carwill take the mould enteinto curing room area automatically, all the mould box will be add into curing room to cure automatically through PLC system in control room.

 (5) when mould box moving in the curing room,all mould boxing moving process is automatically,under the mould box,there will have automatic roller to support moving and be controlled by PLC system incontrol room.

 (6) after 1.**2 hours pre-curing in curing area,the mould box with foam block will move intoreversal craneposition,reversal crane will lift and do the de-mould work, put the block with pallet on cutting translational

cart, then there will have level cutting and vertical cutting process, the cutting process will be controlled in the control room automatically .

 (7) after cutting,the block will be transport into steam trolley trough transport block crane,the crane will be controlled by wireless control device ,also there have the wire control device for spare alternating.

 (8) after finished prepare 6 trolley (*2 block) ,they will be enter into autoclave throughwindlassmachine .

 (9) in autoclave, for sand,it will need about ****1 hours for steam,first we need 1.5 hour to discharge cool air from autoclave and 1 hour to add pressure reach 0.6 Mpa slowly ,then use 0.5 hour to reach 1.**1.3 Mpa quickly. in 1.**1.3 Map period,we need keep about **6 hours steam,after that we will need 1.**2 hours to release the pressure and steam. total after about ****1 hours,the blocks could be take out and transport in store area.

 (*0) the empty pallet with trolley will be sent back to reversal crane and organize into new mould to circle to use. trolley will be transported on preparing enter into autoclave area to circle to use.

 

Send a direct inquiry to this supplier

To:

Mr. fanny < Shandong Wanda Heavy Industry Co., Ltd >

Je veux savoir: