Prestressed and post tensioning clips By Tianjin Zhenhua Pre-stressing force technology Co.Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Prestressed and post tensioning clips

Prestressed and post tensioning clips

0.5 ~ 100 / Piece ( Negotiable )

|

Minimum Order

Localité:

Tianjin Xiqing

Prix de commande minimale:

Commande minimale:

100 Piece

Packaging Detail:

packed with fumigated wooden Cases

Delivery Time:

20days

Supplying Ability:

100000 Piece per Month

Payment Type:

T/T, L/C, D/A, D/P, PayPal

Contacter maintenant
Membre gratuit

Personne à contacter Mr. steven

XINGHUA BRANCH ROAD NO.9, Tianjin Xiqing Development Area Tianjin China., Tianjin, Tianjin

Contacter maintenant

Description

Specifications

Prestressed /post-tensioning Wedge is Key Part of Anchorage syetm. 
Material: *0CrMnTi 
Surface treatment:Heat Treatment

  

 

 

Definition of Wedge       

Wedge is the key part of amchorage suetem, which is made by high-class alloy steel *0CrMnTi.Its form is divided into two chip and three chip. It can be used for Ring anchorage ,flat anchorage,but also used for porous coupler.

 


Application: 

 

YM anchorages can be used to lock ***0Mpa standard strength, which is used on dia of *2.7mm, *2.9mm, *5.2mm, *5.7, *7.8, *8.9, *1.6, *1.8,*8, *9,*2mm. 
It has been widely adopted by modern construction, especially used in pre-tension or post-tension for concrete constructions as building materials. 

INSTRUCTIONS: 



1 YM anchorage must be used with YM working wedge, and YM tool anchorage must be used with YM tool wedge. 

2 Work anchorage can\'t substitute for tool anchorage. 

3 YM series anchorage must be used with the same specification located plates of YM. 

4 Anchorage must be well keeped to prevent rusting and dirts. Before installation, rusting and dirts must be cleand to prevent from damaging the internal thread of wedge which will fill in the alveolar of wedge when tension. 

5 When install anchorage, O Dia of Anchor Head should put in hole of Anchor Bearing Plate, and the restraing plate must in the same direction with the hole of tool anchorage, and the strands cannot be twined around each other and dislocated.

Send a direct inquiry to this supplier

To:

Mr. steven < Tianjin Zhenhua Pre-stressing force technology Co.Ltd. >

Je veux savoir: