Central heating automatic solid fuel boiler By TERMODINAMIK, Turkey
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Central heating automatic solid fuel boiler

Central heating automatic solid fuel boiler

( Negotiable )

|

Minimum Order

Localité:

Izmir, Turkey

Prix de commande minimale:

-

Commande minimale:

1 Piece

Packaging Detail:

Pallet

Delivery Time:

5-20 working days

Supplying Ability:

500 Piece per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter DMYTRO

Kemalpasa Industrial Area, 80th Street, Bld: 10, Ulucak, Kemalpasa, Izmir

Contacter maintenant

Description

EKY/S cylindrical boilers have been engineered in *8 different models with heating capacity range from **5 kW to ***2 kW. *-pass construction allows to benefit from high efficiency and economy of the fuel required for the buring of the boiler.

Advantages of *-pass boilers due to the increased heat transfer surface compared to *-pass boilers:
  • Higher efficiency.
  • Longer boiler’s life cycle due to low thermal loads.
  • Eco-design with low flue gas emission.
  • Longer burning time.
  • Designed for burning of solid fuels as coal, pellet, nut shell and pomace (for boilers upto EKY/S **0) etc.,
  • Resistant to high temperature steel and stable to physical shocks cast iron ensure problem-free operation even under the heaviest conditions,
  • Stainless steel turbulators placed in the flue pipes support heat transfer, decreases fuel consumption and also contributes to long-life of the boiler preventing condensation in the flue pipes.
TSE, CE, GOST-R, UKRSEPRO certified.

Send a direct inquiry to this supplier

To:

DMYTRO < TERMODINAMIK >

Je veux savoir: